Abstract:The microgrid containing a large amount of high frequency power switches and nonlinear components has put forward high requirements for power system real-time simulation technology. In order to reduce the storage pressure of inverse matrices algorithm, the whole network is divided into multiple subnetworks and only the parameters for computing state variable and output variable of subnetworks are stored. Based on the sparse of the constraint equations between subnetworks, a multiport equivalent method of subnetwork hierarchical merge is proposed to reduce the computational cost. Under the condition of limited hardware resources of FPGA, a special processing unit realizing the fine-grained parallelism is designed. A low-voltage microgrid is simulated in real-time on a 5SGSMD5 chip with 2 μs time-step. By comparing the result with the simulation data of PSCAD platform, the feasibility and the accuracy of the proposed real-time simulation method are verified.
王潇,张炳达,乔平. 一种面向微电网实时仿真的分块分层并行算法[J]. 电工技术学报, 2017, 32(7): 104-111.
Wang Xiao,Zhang Bingda,Qiao Ping. A Block Hierarchical Parallel Method for Real-Time Simulation of Microgrid. Transactions of China Electrotechnical Society, 2017, 32(7): 104-111.
[1] 张建华,曾博,张玉莹,等.主动配电网规划关键问题与研究展望[J].电工技术学报,2014,29(2):13-23. Zhang Jianhua,Zeng Bo,Zhang Yuying,et al.Key issues and research prospects of active distribution network planning[J].Transactions of China Electrotechnical Society,2014,29(2):13-23. [2] 郭思琪,袁越,张新松,等.多时间尺度协调控制的独立微网能量管理策略[J].电工技术学报,2014,29(2):122-129. Guo Siqi,Yuan Yue,Zhang Xinsong,et al.Energy management strategy of isolated microgrid based on multi-time scale coordinated control[J].Transactions of China Electrotechnical Society,2014,29(2):122-129. [3] 张先勇,舒杰,吴昌宏,等.一种海岛分布式光伏发电微电网[J].电力系统保护与控制,2014,42(10):55-61. Zhang Xianyong,Shu Jie,Wu Changhong,et al.Island microgrid based on distributed photovoltaic generation[J].Power System Protection and Control,2014,42(10):55-61. [4] 沈沉,吴翔宇,王志文,等.微电网实践与发展思考[J].电力系统保护与控制,2014,42(5):1-11. Shen Chen,Wu Xiangyu,Wang Zhiwen.Practice and rethinking of microgrids[J].Power System Protection and Control,2014,42(5):1-11. [5] Blanchette H F,Ould-Bachir T,David J P.A state-space modeling approach for the FPGA-based real-time simulation of high switching frequency power converters[J].IEEE Transactions on Industrial Electronics,2012,59(12):4555-4567. [6] 王成山,武震,李鹏.微电网关键技术研究[J].电工技术学报,2014,29(2):1-12. Wang Chengshan,Wu Zhen,Li Peng.Research on key technologies of microgrid[J].Transactions of China Electrotechnical Society,2014,29(2):1-12. [7] 李海平,唐巍.风/光/储混合微电网的详细建模与仿真[J].电力系统保护与控制,2012,40(18):132-138. Li Haiping,Tang Wei.Detailed modeling and simulation of wind/PV/storage hybrid micro-grid[J].Power System Protection and Control,2012,40(18):132-138. [8] Watson N R,Jos A.Power systems electromagnetic transients simulation[M].London:The Institution of Electrical Engineers,2003. [9] Chatterjee A,Keyhani A.Thevenin’s equivalent of photovoltaic source models for MPPT and power grid studies[C]//IEEE Power & Energy Society General Meeting,San Diego,2011:1-7. [10]王成山,黄碧斌,李鹏,等.燃料电池复杂非线性静态特性模型简化方法[J].电力系统自动化,2011,35(7):64-69. Wang Chengshan,Huang Bibin,Li Peng,et al.Model simplification method of complex nonlinear static characteristics of fuel cell[J].Automation of Electric Power Systems,2011,35(7):64-69. [11]司新跃,陈青,高湛军.基于分段线性的光伏阵列等效模型[J].电网技术,2014,38(4):947-951. Si Xinyue,Chen Qing,Gao Zhanjun.A piecewise linearization based equivalent model of photovoltaic array[J].Power System Technology,2014,38(4):947-951. [12]Ould-Bachir T,Blanchette H F,Al-Haddad K.A network tearing technique for FPGA-based real-time simulation of power converters[J].IEEE Transactions on Industrial Electronics,2015,62(6):3409-3418. [13]Chen Y,Dinavahi V.FPGA-based real-time EMTP[J].IEEE Transactions on Power Delivery,2009,24(2):892-902. [14]Matar M,Iravani R.FPGA implementation of the power electronic converter model for real-time simulation of electromagnetic transients[J].IEEE Transactions on Power Delivery,2010,25(2):852-860. [15]于力,许爱东,郭晓斌,等.基于RTDS的有源配电网暂态实时仿真与分析[J].电力系统及其自动化学报,2015,27(4):18-25. Yu Li,Xu Aidong,Guo Xiaobin,et al.Real-time transient simulation and analysis of active distribution network based on RTDS[J].Proceedings of the CSU-EPSA,2015,27(4):18-25. [16]Toshiji K,Kaoru I,Takayuki F,et al.Multirate analysis method for a power electronic system by circuit partitioning[J].IEEE Transactions on Power Electronic,2009,24(12),2791-2802. [17]Benigni A,Monti A,Dougal R A.Latency-based approach to the simulation of large power electronics systems[J].IEEE Transactions on Power Electronics,2014,29(6):3201-3213. [18]Chen Y,Dinavahi V.Hardware emulation building blocks for real-time simulation of large-scale power grids[J].IEEE Transactions on Industrial Informatics,2014,10(1):373-381. [19]李鹏,王成山,黄碧斌,等.分布式发电微网系统暂态时域仿真方法研究——(三)算例实现与仿真验证[J].电力自动化设备,2013,33(4):35-43. Li Peng,Wang Chengshan,Huang Bibin,et al.Methodology of transient simulation in time domain for DG and microgrid (3):case study and validation[J].Electric Power Automation Equipment,2013,33(4):35-43. [20]张步涵,曾杰,毛承雄,等.电池储能系统在改善并网风电场电能质量和稳定性中的应用[J].电网技术,2006,30(15):54-58. Zhang Buhan,Zeng Jie,Mao Chengxiong,et al.Improvement of power quality and stability of wind farms connected to power grid by battery energy storage system[J].Power System Technology,2006,30(15):54-58. [21]李勤丰,李尤丰,丁根宏.一个新的极大独立集算法及独立数的界[J].计算机工程与应用,2008,44(26):48-50. Li Qinfeng,Li Youfeng,Ding Genhong.Minimum vertex cover algorithm for solving the planar graph[J].Computer Engineering and Applications,2008,44(26):48-50. [22]王潇,张炳达,陈雄.电力系统实时仿真中细粒度并行的一种实现[J].天津大学学报:自然科学与工程技术版,2016,49(5):513-519. Wang Xiao,Zhang Bingda,Chen Xiong.An implementation of fine granularity parallelization in power system real-time simulation[J].Journal of Tianjin University(Science and Technology),2016,49(5):513-519.