Abstract:Cold-load pickup as a result of a major contribution of thermostatically controlled loads makes load amount be higher than pre-outage levels, even exceeding the maximum restorable load amount. To ensure efficient and smooth load restoration, this paper proposes a novel load restoration reduction method considering demand response of air conditioning loads which are the representative of thermostatically controlled loads. At first, a model for estimating the aggregated power of air conditioning loads taking into account the outage time is developed, which can calculate the aggregated power after a period of outage rapidly. Then, considering the transient safety constraints and the system available recovery power, the maximum restorable load amount that a substation can pick up at one time is determined. Finally, based on estimation model and the maximum restorable load amount, the demand response technique is used to reduce the load restoration amount to make sure the load restoration is within the maximum limit. The simulation results demonstrate that the proposed method can achieve the reduction of air conditioning loads amount under different scenarios by means of demand response techniques and ensure the reliable restoration of a system.
范睿, 孙润稼, 刘玉田. 考虑空调负荷需求响应的负荷恢复量削减方法[J]. 电工技术学报, 2022, 37(11): 2869-2877.
Fan Rui, Sun Runjia, Liu Yutian. A Load Restoration Amount Reduction Method Considering Demand Response of Air Conditioning Loads. Transactions of China Electrotechnical Society, 2022, 37(11): 2869-2877.
[1] 许寅, 和敬涵, 王颖, 等. 韧性背景下的配网故障恢复研究综述及展望[J]. 电工技术学报, 2019, 34(16): 3416-3429. Xu Yin, He Jinghan, Wang Ying, et al.A review on distribution system restoration for resilience enhancement[J]. Transactions of China Electrotechnical Society, 2019, 34(16): 3416-3429. [2] 刘玉田, 王洪涛, 叶华. 电力系统恢复理论与技术[M]. 北京: 科学出版社, 2014. [3] Liu Yutian, Fan Rui, Terzija V.Power system restoration: a literature review from 2006 to 2016[J]. Journal of Modern Power Systems and Clean Energy, 2016, 4(3): 332-341. [4] 吴润基, 王冬晓,谢昌鸿,等. 空调负荷参与配电网电压管理的分布式控制方法[J]. 电力系统自动化, 2021, 45(6): 215-222. Wu Runji, Wang Dongxiao,Xie Changhong,et al.Distributed control method for air-conditioning load participating in voltage management of distribution network[J]. Automation of Electric Power Systems, 2021, 45(6): 215-222. [5] 何剑, 屠竞哲, 孙为民, 等. 美国加州“8·14”、“8·15”停电时间初步分析及启示[J]. 电网技术, 2020, 44(12): 4471-4479. He Jian, Tu Jingzhe, Sun Weimin, et al.Preliminary analysis and lessons of California power outage events on August 14 and 15, 2020[J]. Power System Technology, 2020, 44(12): 4471-4479. [6] 胡秦然, 丁昊晖, 陈心宜, 等. 美国加州2020年轮流停电事故分析及其对中国电网的启示[J]. 电力系统自动化, 2020, 44(24): 11-18. Hu Qinran, Ding Haohui, Chen Xinyi, et al.Analysis on rotating power outage in California in 2020 and its enlightenment to power grid in China[J]. Automation of Electric Power Systems, 2020, 44(24): 11-18. [7] Gholami A, Aminifar F.A hierarchical response- based approach to the load restoration problem[J]. IEEE Transactions on Smart Grid, 2017, 8(4): 1700-1709. [8] 覃智君, 侯云鹤, 李大虎, 等. 输电网负荷恢复方案的优化计算方法[J]. 电工技术学报, 2016, 31(8): 116-124. Qin Zhijun, Hou Yunhe, Li Dahu, et al.Optimization method for constructing load restoration strategy of transmission systems[J]. Transactions of China Electrotechnical Society, 2016, 31(8): 116-124. [9] 程改红, 徐政. 基于粒子群优化的最优负荷恢复算法[J]. 电力系统自动化, 2007, 31(16): 62-65. Chen Gaihong, Xu Zheng.Optimal load restoration based on particle swarm optimization[J]. Automation of Electric Power Systems, 2007, 31(16): 62-65. [10] Medina D R, Rappold E, Sanchez O, et al.Fast assessment of frequency response of cold load pickup in power system restoration[J]. IEEE Transactions on Power System, 2016, 31(4): 3249-3256. [11] Schneider K P, Sortomme E, Venkata S S, et al.Evaluating the magnitude and duration of cold load pick-up on residential distribution feeders using multi-state load models[J]. IEEE Transactions on Power System, 2016, 31(5): 3765-3774. [12] Gilvanejad M, Abyaneh H A, Mazlumi K.Estimation of cold-load pickup occurrence rate in distribution systems[J]. IEEE Transactions on Power Delivery, 2013, 28(2): 1138-1147. [13] 王成山, 刘梦璇, 陆宁. 采用居民温控负荷控制的微网联络线功率波动平滑方法[J]. 中国电机工程学报, 2012, 32(25): 36-43. Wang Chengshan, Liu Mengxuan, Lu Ning.A tie-line power smoothing method for microgrid using residential thermostatically-controlled loads[J]. Proceedings of the CSEE, 2012, 32(25): 36-43. [14] 王蓓蓓, 胡晓青, 顾伟扬, 等. 分层控制架构下大规模空调负荷参与调峰的分散式协同控制策略[J]. 中国电机工程学报, 2019, 39(12): 3514-3527. Wang Beibei, Hu Xiaoqing, Gu Weiyang, et al.Hierarchical control architecture and decentralized cooperative control strategy for large scale air conditioning load participating in peak load regulation[J]. Proceedings of the CSEE, 2019, 39(12): 3514-3527. [15] 肖天颖, 裴玮. 陈乃仕, 等. 考虑空调负荷削负荷能力不确定性的孤岛最大运行时长评估[J]. 中国电机工程学报, 2019, 39(17): 4982-4994. Xiao Tianying, Pei Wei, Chen Naishi, et al.Maximum operation duration assessment of isolated island considering the uncertainty of load reduction capability of air conditioner[J]. Proceedings of the CSEE, 2019, 39(17): 4982-4994. [16] 贾雨龙, 米增强, 余洋, 等. 计及不确定性的柔性负荷聚合商随机-鲁棒投标决策模型[J]. 电工技术学报, 2019, 34(19): 4096-4107. Jia Yulong, Mi Zengqiang, Yu Yang, et al.Stochastic-robust decision-making model for flexible load aggregator considering uncertainties[J]. Transactions of China Electrotechnical Society, 2019, 34(19): 4096-4107. [17] 李亚平, 姚建国, 雍太有, 等. 居民温控负荷聚合功率及响应潜力评估方法研究[J]. 中国电机工程学报, 2017, 37(19): 5519-5528. Li Yaping, Yao Jianguo, Yong Taiyou, et al.Estimation approach to aggregated power and response potential of residential thermostatically controlled loads[J]. Proceedings of the CSEE, 2017, 37(19): 5519-5528. [18] 吴界辰, 艾欣, 胡俊杰. 需求侧资源灵活性刻画及其在日前优化调度中的应用[J]. 电工技术学报, 2020, 35(9): 1973-1984. Wu Jiechen, Ai Xin, Hu Junjie.Methods for characterizing flexibilities from demand-side resources and their applications in the day-ahead optimal scheduling[J]. Transactions of China Electrotechnical Society, 2020, 35(9): 1973-1984. [19] Qu Hanbing, Liu Yutian.Maximizing restorable load amount for specific substation during system restoration[J]. International Journal of Electrical Power & Energy Systems, 2012, 43(1): 1213-1220. [20] Adibi M M, Borkoski J N, Kafka R J, et al.Frequency response of prime movers during restoration[J]. IEEE Transactions on Power System, 1999, 14(2): 751-756. [21] 常烨骙, 李卫东, 巴宇, 等. 基于运行安全的频率控制性能评价新方法[J]. 电工技术学报, 2019, 34(6): 1218-1229. Chang Yekui, Li Weidong, Ba Yu.A new method for frequency control performance assessment on operation security[J]. Transactions of China Electrotechnical Society, 2019, 34(6): 1218-1229. [22] 宁佳, 汤奕, 高丙团. 基于需求响应潜力时变性的风火荷协同控制方法[J]. 电工技术学报, 2019, 34(8): 1728-1738. Ning Jia, Tang Yi, Gao Bingtuan.Coordinated control method of wind farm-AGC unit-load based on time-varying characteristics of demand response potential[J]. Transactions of China Electrotechnical Society, 2019, 34(8): 1728-1738. [23] Cheng Dingyi, Zhang Wei, Liu Yutian.Aggregate modeling and analysis of air conditioning load using coupled Fokker-Planck equations[J]. Journal of Modern Power Systems and Clean Energy, 2018, 6(6): 1277-1290.