电工技术学报  2018, Vol. 33 Issue (5): 1076-1085    DOI: 10.19595/j.cnki.1000-6753.tces.170087
电力系统 |
考虑源荷双侧不确定性的模糊随机机会约束优先目标规划调度模型
赵冬梅, 殷加玞
华北电力大学电气与电子工程学院 北京 102206
Fuzzy Random Chance Constrained Preemptive Goal Programming Scheduling Model Considering Source-Side and Load-Side Uncertainty
Zhao Dongmeim, Yin Jiafu
School of Electrical and Electronic Engineering North China Electric Power University Beijing 102206 China
全文: PDF (10223 KB)  
输出: BibTeX | EndNote (RIS)      
摘要 针对风电功率和分时电价(TOU)下用户响应行为的双重不确定性对电网调度运行的影响,提出了基于模糊随机机会约束目标规划(FRCCGP)和优先目标规划(PGP)结合,求解计及预测误差模糊随机性的双层调度模型。首先,深入研究了电网调度运行的不确定因素,利用模糊随机理论对预测误差的模糊随机性进行建模。然后,引入机会约束目标规划构建表征系统备用不足风险的偏差量指标,利用优先目标规划建立双层调度模型,对安全性目标和经济性目标设立明确的等级顺序。最后,利用算例验证模型的有效性,结果表明双层调度模型在保证安全性的基础上实现了经济最优性。
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
E-mail Alert
RSS
作者相关文章
赵冬梅
殷加玞
关键词 源荷双侧不确定性模糊随机理论机会约束目标规划优先目标规划运行调度    
Abstract:The double uncertainty of wind power output and demand response of time of use (TOU) bring great difficulty to the system operation scheduling. Based on the combination of fuzzy random chance constrained goal programming (FRCCGP) and preemptive goal programming (PGP), the paper established the bi-level dispatch model considering fuzziness and randomness of the prediction error. First of all, the paper deeply studied the uncertain factors of system operation and model the double uncertainty of the prediction error. In addition, the chance constrained goal programming was introduced to form the reserve deviation indexes. The bi-level model based on PGP identified the rigorous priority level of the safety goals and the economic goals. Finally, the validity of the model was verified with case studies and results showed that the bi-level model could optimize the operation economy on the basic of meeting the security demand.
Key wordsSource-side and load-side uncertainty    fuzzy random theory    chance constrained goal programming    preemptive goal programming    operation scheduling   
收稿日期: 2017-01-19      出版日期: 2018-03-14
PACS: TM732  
基金资助:国家重点研发计划项目资助(2017YFB0902600)
通讯作者: 殷加玞 男,1993年生,博士研究生,研究方向为电力系统分析与控制、新能源发电与智能电网。E-mail:18810662195@163.com   
作者简介: 赵冬梅 女,1965年生,教授,博士生导师,研究方向为电力系统分析与控制、新能源发电与智能电网。E-mail:zhao-dm@ncepu.edu.cn
引用本文:   
赵冬梅, 殷加玞. 考虑源荷双侧不确定性的模糊随机机会约束优先目标规划调度模型[J]. 电工技术学报, 2018, 33(5): 1076-1085. Zhao Dongmeim, Yin Jiafu. Fuzzy Random Chance Constrained Preemptive Goal Programming Scheduling Model Considering Source-Side and Load-Side Uncertainty. Transactions of China Electrotechnical Society, 2018, 33(5): 1076-1085.