Reliability Evaluation of the High Power Grid-Connected Wind Turbines
Gao Qiang1, 2, Cai Xu1, 2, 3
1. Key Laboratory of Control of Power Transmission and Conversion, Ministry of Education Shanghai Jiao Tong University Shanghai 200240 China; 2. Wind Power Research Centre Shanghai Jiao Tong University Shanghai 200240 China; 3. State Key Laboratory of Ocean Engineering, Shanghai Jiao Tong University Shanghai 200240 China
Abstract:This paper introduces the main concepts about the reliability of the grid-connected high power wind turbines, and then presents a method to evaluate the wind turbine reliabilities based on the historical statistics. Finally, this method is applied to five high power wind turbine concepts, whose reliabilities, along with the method itself are discussed.
高强, 蔡旭. 大功率并网风电机组的可靠性分析[J]. 电工技术学报, 2013, 28(1增): 164-168.
Gao Qiang, Cai Xu. Reliability Evaluation of the High Power Grid-Connected Wind Turbines. Transactions of China Electrotechnical Society, 2013, 28(1增): 164-168.
[1] 於岳亮. 风电机组发电机的技术发展和展望[J]. 电力与能源, 2011, 32(4): 325-334. Yu Yueliang. Technology Development and Prospect of Wind Turbine Generators[J]. Power and Energy, 2011, 32(4): 325-334. [2] Li H, Chen Z. Overview of different wind generator systems and their comparisons[J]. IET Renewable Power Generation, 2008, 2(2): 123-138. [3] 韩力, 薛玉石, 李辉, 等. 不同结构风力永磁同步发电机系统的优化设计与对比[J]. 太阳能学报, 2010, 31(5): 636-642. Han Li, Xue Yushi, Li Hui, et al. Optimum design and comparison of different PMSG wind turbine systems[J]. Acta Energiae Solaris Sinica, 2010, 31(5): 636-642. [4] Polinder H, Van der Pijl, F F A., et al. Comparison of direct-drive and geared generator concepts for wind turbines[J]. IEEE Transactions on Energy Conversion, 2006, 21(3): 543-550. [5] Tavner P J, Xiang J P, Spinato F. Reliability analysis for wind turbines[J]. Wind Energy, 2007, 10: 1-18. [6] 刘天羽, Tavner P J. 风电高速发展下的中国风力发电机可靠性的研究[J]. 上海电机学院学报, 2010, 13(6): 315-321. Liu Tianyu, Tavner P J. Reliability of wind turbine in China under the rapid development of wind power [J]. Journal of Shanghai Dianji University, 2010, 13(6): 315-321. [7] Spinato F, Tavner P J, Van Bussel, et al. Reliability of wind turbine subassemblies[J]. IET Renewable Power Generation, 2009, 3(4): 387-401. [8] Faulstich S, Hahn B, Tavner P J. Wind turbine downtime and its importance for offshore deployment [J]. Wind Energy, 2011, 14: 327-337. [9] Harman K, Walker R, Wilkinson M. Availability trends observed at operational wind farms[C]. Proceedings of the European Wind Energy Confe- rence and Exhibition 2008. [10] Ribrant J, et al. Survey of failures in wind power systems with focus on Swedish wind power plants during 1997-2005[J]. IEEE Transactions on Energy Conversion, 2007, 22(1): 167-173. [11] Faulstich S, Lyding P, Hahn B. Electrical subassemblies of wind turbines—A substantial risk for the availability[C]. Proceedings of the European Wind Energy Conference, 2010.