Investigation on Aftereffect of Power System Extended Black-Start Schemes
Gu Xueping1, Wang Dajiang1, Li Shaoyan1, Li Wenyun2, Zhu Tao2,
1. State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources North China Electric Power University Baoding 071003 China; 2. Yunnan Electric Power Dispatching and Control Center Kunming 650011 China
Abstract:The extended black-start strategy during the early recovery stage after blackout provides a new way for power system restoration. In order to evaluate the aftereffect of an extended black-start scheme, through discretizing the network reconstruction process into a series of successive time steps, a multi-objective network reconstruction optimization model considering the alternation and coordination that unit restarting with load restoration during subsequent reconstruction process is established, and then a solving method combining the lexicographic optimization method with improved bacterial foraging algorithm and Dijkstra algorithm is proposed to solve the model. The units, loads and restoration paths in each time step are optimized from the perspective of the global optimum to obtain the optimal reconstruction scheme. After that, by defining a group of input and output indexes reflecting the multiple elements of reconstruction process, the relative efficiency of the subsequent reconstruction, which represents the aftereffect of the extended black-start scheme, are evaluated by using the super efficiency data envelopment analysis model. The test results on the New England 10-unit 39-bus system verified the validity and correctness of the proposed method.
顾雪平, 李少岩. 电力系统扩展黑启动方案的后效性研究[J]. 电工技术学报, 2015, 30(8): 238-246.
Gu Xueping, Wang Dajiang, Li Shaoyan, Li Wenyun, Zhu Tao,. Investigation on Aftereffect of Power System Extended Black-Start Schemes. Transactions of China Electrotechnical Society, 2015, 30(8): 238-246.
[1] 张东霞, 姚良忠, 马文媛. 中外智能电网发展战略[J]. 中国电机工程学报, 2013, 33(31): 1-14. Zhang Dongxia, Yao Liangzhong, Ma Wenyuan. Deve- lopment strategies of smart grid in China and abroad [J]. Proceedings of the CSEE, 2013, 33(31): 1-14. [2] 薛禹胜, 肖世杰. 综合防御高风险的小概率事件[J]. 电力系统自动化, 2011, 35(8): 1-11. Xue Yusheng, Xiao Shijie. Comprehensively defending high risk events with low probability[J]. Automation of Electric Power Systems, 2011, 35(8): 1-11. [3] 汤涌, 卜广全, 易俊. 印度“7. 30”、“7. 31”大停电事故分析及启示[J]. 中国电机工程学报, 2012, 32(25): 167-174. Tang Yong, Bu Guangquan, Yi Jun. Analysis and lessons of the blackout in indian power grid on july 30 and 31, 2012[J]. Proceedings of the CSEE, 2012, 32(25): 167-174. [4] 毛安家, 张戈力, 吕跃春, 等. 2011年9月8日美墨大停电事故的分析及其对我国电力调度运行管理的启示[J]. 电网技术, 2012, 36(4): 74-78. Mao Anjia, Zhang Geli, Lv Yuechun, et al. Analysis on large-scale blackout occurred in south america and north mexico interconnected power grid on sept. 8, 2011 and lessons for electric power dispatching in China[J]. Power System Technology, 2012, 36(4): 74-78. [5] Adibi M M, Fink L H. Power system restoration planning[J]. IEEE Transactions on Power Systems, 1994, 9(1): 22-28. [6] Lester H F, Lion K L, Liu C C. From generic restoration to specific restoration strategies[J]. IEEE Trans. on Power Systems, 1995, 10(2): 745-752. [7] Jerry J A. A framework for power system restoration following a major power failure[J]. IEEE Transac- tions on Power Systems, 1995, 10(3): 1480-1485. [8] Gomes R, Carlos A, Guarini A. Guidelines for power system restoration in the brazilian system[J]. IEEE Transactions on Power Systems, 2004, 9(2): 1159- 1164. [9] Delfino B, Denegri G B, Invernizzi M, et al. Black- start and restoration of a part of the Italian HV network: modeling and simulation of a field test[J]. IEEE Trans. on Power Systems, 1996, 11(3): 1371- 1379. [10] 张玉琼, 顾雪平. 基于随机统计分析的黑启动操作过电压的计算校验[J]. 电工技术学报, 2005, 20(5): 92-97. Zhang Yuqiong, Gu Xueping. Computation and statis- tical evaluation of operating over voltages in black- start process of power systems[J]. Transactions of China Electrotechnical Society, 2005, 20(5): 92-97. [11] 吴烨, 房鑫炎. 基于模糊 DEA 模型的电网黑启动方案评估优化算法[J]. 电工技术学报, 2008, 23(8): 101-106. Wu Ye, Fang Xinyan. Data envelopment analysis based optimal fuzzy algorithm for assessing power grid black-start plans[J]. Transactions of China Elec- trotechnical Society, 2008, 23(8): 101-106. [12] 林振智, 文福拴, 薛禹胜, 等. 基于多属性群决策特征根法的智能电网黑启动决策[J]. 电力系统自动化, 2010, 34(5): 18-23. Lin Zhenzhi, Wen Fushuan, Xue Yusheng, et al. Black- start decision-making in smart grids using muti-attribute group eigenvalue method[J]. Automation of Electric Power Systems, 2010, 34(5): 18-23. [13] 吴烨, 房鑫炎, 张焰, 等. 电网黑启动的广义模式评估算法[J]. 电工技术学报, 2011, 26(3): 155-161. Wu Ye, Fang Xinyan, Zhang Yan, et al. Generalized assessment algorithm for power grid black-start modes [J]. Transactions of China Electrotechnical Society, 2011, 26(3): 155-161. [14] 林济铿, 李童飞, 赵子明, 等. 基于熵权模糊综合评价模型的电力系统黑启动方案评估[J]. 电网技术, 2012, 36(2): 115-120. Lin Jikeng, Li Tongfei, Zhao Ziming, et al. Assessment on power system black-start schemes based onentropy weighted fuzzy comprehensive evaluation model[J]. Power System Technology, 2012, 36(2): 115-120. [15] 顾雪平, 钟慧荣, 贾京华, 等. 电力系统扩展黑启动方案的研究[J]. 中国电机工程学报, 2011, 31(28): 25-32. Gu Xueping, Zhong Huirong, Jia Jinghua, et al. Extended black-start schemes of power systems[J]. Proceedings of the CSEE, 2011, 31(28): 25-32. [16] Liu Yan, Gu Xueping. Skeleton network reconfig- uration based on topological characteristics of scale- free networks and discrete particle swarm optimization [J]. IEEE Transactions on Power Systems, 2007, 22(3): 1267-1274. [17] 王亮, 刘艳, 顾雪平, 等. 综合考虑节点重要度和线路介数的网络重构[J]. 电力系统自动化, 2010, 34(12): 29-33. Wang Liang, Liu Yan, Gu Xueping, et al. Skeleton network reconfiguration based on node importance and line betweenness[J]. Automation of Electric Power Systems, 2010, 34(12): 29-33. [18] 周云海, 闵勇. 恢复控制中的系统重构优化算法研究[J]. 中国电机工程学报, 2003, 23(4): 67-71. Zhou Yunhai, Min Yong. Optimal algorithm for system reconstruction[J]. Proceedings of the CSEE, 2003, 23(4): 67-71. [19] 刘强, 石立宝, 倪以信, 等. 电力系统恢复控制的网络重构智能优化策略[J]. 中国电机工程学报, 2009, 29(13): 8-15. Liu Qiang, Shi Libao, Ni Yixin, et al. Intelligent optimization strategy of the power grid reconfi- guration during power system restoration[J]. Procee- dings of the CSEE, 2009, 29(13): 8-15. [20] 林振智, 文福拴. 基于加权复杂网络模型的恢复路径优化方法[J]. 电力系统自动化, 2009, 33(6): 11-15, 103. Lin Zhenzhi, Wen Fushuan. A new optimization method for determining restoration paths based on weighted complex network model[J]. Automation of Electric Power Systems, 2009, 33(6): 11-15, 103. [21] 周云海, 刘映尚, 胡翔勇. 大停电事故后的系统网架恢复[J]. 中国电机工程学报, 2008, 28(10): 32-36. Zhou Yunhai, Liu Yingshang, Hu Xiangyong. Power system network reconstruction after blackout[J]. Pro- ceedings of the CSEE, 2008, 28(10): 32-36. [22] 王洪涛, 刘玉田. 电力系统恢复的主从递阶决策模型及其优化算法[J]. 中国电机工程学报, 2007, 27(1): 8-13. Wang Hongtao, Liu Yutian. Leader-follower hierar- chical decision model and optimal method for power system restoration[J]. Proceedings of the CSEE, 2007, 27(1): 8-13. [23] 王洪涛, 刘玉田. 基于NSGA-Ⅱ的多目标输电网架最优重构[J]. 电力系统自动化, 2009, 33(23): 14-18. Wang Hongtao, Liu Yutian. Multi-objective optimiza- tion of power system reconstruction based on NSGA- II[J]. Automation of Electric Power Systems, 2009, 33(23): 14-18. [24] Gu X, Zhong H. Optimisation of network reconfigura- tion based on a two-layer unit-restarting framework for power system restoration[J]. IET Generation, Trans- mission & Distribution, 2011, 6(7): 693-700. [25] Zhang Can, Lin Zhenzhi, Wen Fushuan, et al. Two stage power network reconfiguration strategy conside- ring node importance and restored generation capacity [J]. IET Generation, Transmission & Distribution, 2014, 8(1): 91-103. [26] Passino K M. Biomimicry of bacterial foraging for distributed optimization and control[J]. IEEE Control Systems Magazine, 2002, 22(6): 52-67. [27] 戴秋萍, 马良, 郗莹. 求解0-1背包问题的细菌觅食算法[J]. 数学的实践与认识, 2013, 43(3): 178-183. Dai Qiuping, Ma Liang, Xi Ying. Bacterial foraging algorithm for 0-1 knapsack problem[J]. Mathematics in Practice and Theory, 2013, 43(3): 178-183. [28] 马占新. 数据包络分析模型与方法[M]. 北京: 科学出版社, 2010.