Abstract:HVDC converter Transformer valve side faults have the diversity and space-time discrete and the fault locates at the high bridge or the low bridge will leads different valve condition. The fault phase measuring current will be different if the location of CT to fault is different and also the fault character will change as the fault time changed. Combined with the simulation of CIGRE model, this paper overcomes an analysis of single case limitation and analyses 4 typical grounding faults at the HVDC converter Transformer valve side. Based on the study of commutation voltage and fault loop in fault condition, the way of analyzing the valve condition is found. Considering the valve commutation law, one way of fault feature stage dividing is proposed; also the transient process of converter valves is studied. Finally, combined with the protection configuration of TianGuang HVDC, all protection functions are checking, and a way of chose phase in BPP is pointed out.
李晓华, 刘洋, 蔡泽祥. 直流输电换流变压器阀侧交流单相接地故障[J]. 电工技术学报, 2012, 27(6): 38-45.
Li Xiaohua, Liu Yang, Cai Zexiang. Analysis of Grounding Fault at HVDC Converter Transformer Valve Side. Transactions of China Electrotechnical Society, 2012, 27(6): 38-45.
[1] 赵畹君. 高压直流输电技术[M]. 北京: 中国电力出版社, 2004. [2] 浙江大学发电教研组直流输电科研组. 直流输电[M]. 北京: 电力工业出版社, 1982. [3] 龙英. 西北—华中联网背靠背直流极区的接地保护设计[J]. 高电压技术, 2005, 31(2): 42-45. Long Ying. Design study of protection for DC block ground fault for northwest to central China BTB HVDC link[J]. High Voltage Engineering, 2005, 31(2): 42-45. [4] 吴云飞, 黄友生. 换流变压器阀侧套管局部温度过高的故障分析[J]. 变压器, 2007, 44(8): 36-38. Wu Yunfei, Huang Yousheng. Analysis of partial overtemperature fault of valve bushing in converter transformer [J]. Transformer, 2007, 44(8): 36-38. [5] 李应文, 徐兵, 吴力娜. 换流变压器套管受潮分析及预防措施[J]. 变压器, 2008, 45(4): 71-73. Li Yingwen, Xu Bing, Wu Lina. Wetted analysis and preventive measures of bushing in converter transformer[J]. Transformer, 2008, 45(4): 71-73. [6] 吕鹏飞, 卢宇, 王德林, 等. 灵宝背靠背直流换流站220kV换流变压器故障保护动作分析[J]. 电力系统自动化, 2008, 32(12): 211-214. Lu Pengfei, Lu Yu, Wang Delin, et al. Protection action analysis of Lingbao HVDC system 220kV converter transformer earthed fault[J]. Automation of Electric Power Systems, 2008, 32(12): 211-214. [7] 罗海云, 余江, 欧开健. 换流变压器阀侧接地故障特性分析[J]. 中国电力, 2009, 42(6): 84-87. Luo Haiyun, Yu Jiang, Ou Kaijian. Grounding fault analysis at converter transformer valve side[J]. Electric Power, 2009, 42(6): 84-87. [8] 刘洋, 李晓华, 蔡泽祥. 直流输电系统换流器接地故障定位[J]. 电力系统自动化, 2010, 34(8): 86-91. Liu Yang, Li Xiaohua, Cai Zexiang. Location of HVDC converter grounding fault[J]. Automation of Electric Power Systems, 2010, 34(8): 86-91. [9] 杨汾艳, 徐政. 直流输电系统典型暂态响应特性分析[J]. 电工技术学报, 2005, 20(3): 45-52. Yang Fenyan, Xu Zheng. Typical transient responses in HVDC transmission system[J]. Transactions of China Electrotechnical Society, 2005, 20(3): 45-52. [10] 国网运行有限公司组编. 换流器及直流控制保护设备[M]. 北京: 中国电力出版社, 2009. [11] 娄彦涛, 吕金壮, 苟锐锋, 等. 直流输电系统紧急停运方式对系统过电压的影响[J]. 南方电网技术, 2009, 3(6): 13-17. Lou Yantao, Lu Jinzhuang, Gou Ruifeng, et al. Influence of the ESOF strategy on HVDC system overvoltage[J]. Southern Power System Technology, 2009, 3(6): 13-17. [12] 饶宏, 蔡希鹏, 傅闯, 等. 贵广二回高压直流逆变站无通信紧急跳闸试验的仿真分析[J]. 南方电网技术, 2009, 1(2): 13-18. Rao Hong, Cai Xipeng, Fu Chuang, et al. Simulation analysis on the abnormal results of the manual ESOF test to Gui-Guang II HVDC link system[J]. Southern Power System Technology, 2009, 1(2): 13-18. [13] 朱艺颖, 王明新, 印永华. 三广直流输电系统调试中阀避雷器爆炸事故分析[J]. 电力系统自动化, 2005, 29(11): 74-76. Zhu Yiying, Wang Mingxin, Yin Yonghua. Analysis on the accident of valve arrestor explosion during the commissioning test of three gorges to guangdong HVDC transmission project[J]. Automation of Electric Power Systems, 2005, 29(11): 74-76.