|
|
Peaking Value Quantification and Cost Compensation for Generators |
Xie Jun1, Li Zhengkun3, Zhang Meidan2, Zhang Xiaohua4, Wu Fuxia1,2, Fu Rong1 |
1. Nanjing University of Posts and Telecommunications Nanjing 210046 China
2. Zhejiang University Hangzhou 310027 China; 3. Shanghai University of Electric Power Shanghai 200090 China; 4. Changzhou University Changzhou 213164 China
|
|
|
Abstract In hydro-wind-thermal hybrid power system, the peaking of hydro generators is valuable. In this paper, an economic dispatch model for hydro-wind-thermal hybrid system is proposed, which is modeled as a mixed integer linear programming(MILP)problem and therefore can be efficiently solved by using GAMS. The peaking value of generators is quantified by using the proposed economic dispatch model. Based on Shaley value and peaking mileage concepts, two peaking cost compensation methods are proposed. The effectiveness of the proposed methods is shown with the simulation results of a 5-generator 8-bus power system.
|
Received: 18 October 2010
Published: 27 November 2013
|
|
|
|
|
[1] 王鹏, 张灵凌, 梁琳, 等. 火电机组有偿调峰与无偿调峰划分方法探讨[J]. 电力系统自动化, 2010, 34(9): 87-90. Wang Peng, Zhang Lingling, Liang Lin, et al. A method for division of paid peak-regulation and free peak-regulation for thermal power units[J]. Automation of Electric Power Systems, 2010, 34(9): 87-90. [2] 胡建军, 胡飞雄. 节能发电调度模式下有偿调峰补偿新机制[J]. 电力系统自动化, 2009, 33(10): 16-18. Hu Jianjun, Hu Feixiong. A novel compensation mechanism of remunerative peak load regulation under energy-saving dispatch framework[J]. Automation of Electric Power Systems, 2009, 33(10): 16-18. [3] 杨宏, 刘建新, 苑津莎. 风电系统中常规机组负调峰能力研究[J]. 中国电机工程学报, 2010, 30(16): 26-31. Yang Hong, Liu Jianxin, Yuan Jinsha. Research of peak load regulation of conventional generators in wind power grid[J]. Proceedings of the CSEE, 2010, 30(16): 26-31. [4] 张宏宇, 印永华, 申洪. 大规模风电接入后的系统调峰充裕性评估[J]. 中国电机工程学报, 2011, 31(22): 26-31. Zhang Hongyu, Yin Yonghua, Shen Hong, He Jian, et al. Peak-load regulating adequacy evaluation associated with large-scale wind power integration[J]. Proceedings of the CSEE, 2011, 31(22): 26-31. [5] 静铁岩, 吕泉, 郭琳. 水电—风电系统日间联合调峰运行策略[J]. 电力系统自动化, 2011, 35(22): 97-104. Jing Tieyan, Lu Quan, Guo Lin, et al. An inter-day combined operation strategy of hydro and wind power system for regulating peak load[J]. Automation of Electric Power Systems, 2011, 35(22): 97-104. [6] 王若谷, 王建学, 张恒, 等. 水电机组调峰服务的成本分析及实用补偿方法[J]. 电力系统自动化, 2011, 35(23): 41-46. Wang Ruogu, Wang Jianxue, Zhang Heng, et al. A cost analysis and practical compensation method for hydropower units peaking service[J]. Automation of Electric Power Systems, 2011, 35(23): 41-46. [7] Young H Peyton. Equity: in theory and practice[M]. Princeton (USA): Princeton University Press, 1994. [8] Xie J, Fu R, Du P, Zhang M. Wind-thermal unit commitment with mixed-integer linear EENS and EEES formulations[C]. The 4th International Conference on Electric Utility Deregulation and Restructuring and Power Technologies (DRPT), Weihai (PRC), 2011. [9] Carrion Miguel, Arroyo Jose M. A computationally efficient mixed-integer linear formulation for the thermal unit commitment problem[J]. IEEE Transactions on Power Systems, 2006, 21(3): 1371-1378. [10] Chen C L. Optimal wind-thermal generating unit commitment[J]. IEEE Transactions on Power Systems, 2008, 23(1): 273-280. |
|
|
|