[1] 高本锋,张学伟,刘辛晔,等.高压直流输电保护定值整定流程的研究[J].电工技术学报,2015,30(12):400 407.
Gao Benfeng,Zhang Xuewei,Liu Xinye,et al.Research of HVDC protection value setting process[J].Transactions of China Electrotechnical Society,2015,30(12):400 407.
[2] 陈仕龙,谢佳伟,毕贵红,等.一种特高压直流输电线路神经网络双端故障测距新方法[J].电工技术学报,2015,30(4):257 264.
Chen Shilong,Xie Jiawei,Bi Guihong,et al.A novel two terminal fault location method used ANN for UHVDC transmission line[J].Transactions of China Electrotechnical Society,2015,30(4):257 264.
[3] 陈仕龙,张杰,刘红锐,等.特高压直流输电线路单端电流方向暂态保护[J].电工技术学报,2016,31(2):171 177.
Chen Shilong,Zhang Jie,Liu Hongrui,et al.A single ended current direction transient protection of UHVDC transmission line[J].Transactions of China Electrotechnical Society,2016,31(2):171 177.
[4] 黄道春,黎鹏,阮江军,等.山火引发输电线路间隙放电机理与击穿特性综述[J].高电压技术,2015,41(2):622 632.
Huang Daochun,Li Peng,Ruan Jiangjun,et al.Review on discharge mechanism and breakdown characteristics of transmission line gap under forest fire condition[J].High Voltage Engineering,2015,41(2):622 632.
[5] 陆佳政,吴传平,杨莉,等.输电线路山火监测预警系统的研究及应用[J].电力系统保护与控制,2014,42(16):89 95.
Lu Jiazheng,Wu Chuanping,Yang Li,et al.Research and application of forest fire monitor and early warning system for transmission line[J].Power System Protection and Control,2014,42(16):89 95.
[6] 刘明军,邵周策,上官帖,等.输电线路山火故障风险评估模型及评估方法研究[J].电力系统保护与控制,2016,44(6):82 89.
Liu Mingjun,Shao Zhouce,Shangguan Tie,et al.Study on models and methods of risk assessment of transmission line fault caused by fire[J].Power System Protection and Control,2016,44(6):82 89.
[7] 叶立平,陈锡阳,何子兰,等.山火预警技术在输电线路的应用现状[J].电力系统保护与控制,2014,42(6):145 153.
Ye Liping,Chen Xiyang,He Zilan,et al.Present situation of forest fire early warning technology used for transmission line[J].Power System Protection and Control,2014,42(6):145 153.
[8] 吴田,胡毅,阮江军,等.交流输电线路模型在山火条件下的击穿机理[J].高电压技术,2011,37(5):1115 1122.
Wu Tian,Hu Yi,Ruan Jiangjun,et al.Air gap breakdown mechanism of model AC transmission line under forest fires[J].High Voltage Engineering,2011,37(5):1115 1122.
[9] Cooray Vernon.The lightning flash[M].London,UK:The Institution of Engineering and Technology,2003.
[10] 雷清泉. 工程电介质的最新进展[M].北京:科学出版社,1999.
[11] Hara M,Nakagawa H,Suehiro J,et al.Electrical breakdown triggered by a free conducting spherical particle in saturated liquid He I and He II under uniform DC field[J].IEEE Transactions on Dielectrics and Electrical Insulation,2003,10(6):1022 1031.
[12] Hara M,Negara Y,Setoguchi M,et al.Particle triggered pre breakdown phenomena in atmospheric air gap under AC voltage[J].IEEE Transactions on Dielectrics and Electrical Insulation,2005,12(5):1071 1081.
[13] Sakai K I,Abella D L,Khan Y,et al.Theoretical and experimental studies for spherical free conducting particle behavior between nonparallel plane electrodes with AC voltages in air[J].IEEE Transactions on Dielectrics and Electrical Insulation,2003,10(3):404 417.
[14] 邓鹤鸣. 雷电冲击电压下两相体放电特性研究[D].武汉:华中科技大学,2010.
[15] Robledo Martinez A,Guzman E,Hernandez J L.Dielectric characteristics of a model transmission line in the presence of fire[J].IEEE Transactions on Electrical Insulation,1991,26(4):776 782.
[16] Sadurski K J,Reynders J P.High voltage AC breakdown in presence of fires[C]//6th International Symposium on High Voltage Engineering,New Orleans,LA,USA:1989:1 4.
[17] Naidoo P,Swift D A.Large particle initiated breakdown of an atmospheric air gap:relating to AC power line faults caused by sugar cane fires[C]//The 8th International Symposium on High Voltage Engineering(ISH),Yokohama,Japan,1993:81 84.
[18] 陶玉柱,邸雪颖,金森.我国森林火灾发生的时空规律研究[J].世界林业研究,2013,26(5):75 80.
Tao Yuzhu,Di Xueying,Jin Sen.Research on temporal and spatial distribution of forest in China[J].World Forestry Research,2013,26(5):75 80.
[19] 陆佳政,刘毓,杨莉,等.输电线路山火发生规律分析[J].消防科学与技术,2014,33(12):1447 1450.
Lu Jiazheng,Liu Yu,Yang Li,et al.Rules of transmission line fire induced by wildfire[J].Fire Science and Technology,2014,33(12):1447 1450. |