[1] 刘振亚. 全球能源互联网[M]. 北京: 中国电力出版社, 2005.
[2] 陈仕龙, 张杰, 刘红锐, 等. 特高压直流输电线路单端电流方向暂态保护[J]. 电工技术学报, 2016, 31(2): 171-177.Chen Shilong, Zhang Jie, Liu Hongrui, et al. A single-ended current direction transient protection of UHVDC transmission line[J]. Transactions of China Electrotechnical Society, 2016, 31(2): 171-177.
[3] 刘士利, 王洋, 张力丹, 等. ±800kV特高压直流受端分层接入方式下低端阀厅金具结构设计[J]. 电工技术学报, 2017, 32(14): 238-245. Liu Shili, Wang Yang, Zhang Lidan, et al. Structure design of ±800kV UHVDC receiving end low voltage valve hall fitting for hierarchical connection[J]. Transactions of China Electrotechnical Society, 2017, 32(14): 238-245.
[4] 陈仕龙, 谢佳伟, 毕贵红, 等. 一种特高压直流输电线路神经网络双端故障测距新方法[J]. 电工技术学报, 2015, 30(4): 257-264. Chen Shilong, Xie Jiawei, Bi Guihong, et al. A novel two terminal fault location method used ANN for UHVDC transmission line[J]. Transactions of China Electrotechnical Society, 2015, 30(4): 257-264.
[5] 卢毓欣, 韩永霞, 朱志芳, 等. ±1000kV特高压直流换流站绝缘配合[J]. 电工技术学报, 2014, 29(增刊1): 516-523. Lu Yuxin, Han Yongxia, Zhu Zhifang, et al. The insulation and coordination of ±1000kV UHVDC converter station[J]. Transactions of China Electrotechnical Society, 2014, 29(S1): 516-523.
[6] 杜旭, 韩民晓, 田春筝, 等. ±1100kV特高压多端馈入直流系统协调控制[J]. 电工技术学报, 2016, 31(增刊1): 176-183.Du Xu, Han Minxiao, Tian Chunzheng, et al. Coordinated control research of ±1100kV ultra high voltage multi-terminal direct current system[J]. Transactions of China Electrotechnical Society, 2016, 31(S1): 176-183.
[7] 彭谦, 李军, 卞鹏, 等. 改进电气几何模型法在1000 kV输电线路雷电绕击跳闸率计算中的应用[J]. 电网技术, 2010, 34(9): 155-159. Peng Qian, Li Jun, Bian Peng, et al. Application of improved electrical geometry model in calculation of lightning shielding failure-caused trip-out rate of 1000kV power transmission line[J]. Power System Technology, 2010, 34(9): 155-159.
[8] 卢泽军, 谷山强, 赵淳, 等. 应用电气几何模型的高速铁路接触网防雷性能分析[J]. 电网技术, 2014, 38(3): 812-816. Lu Zejun, Gu Shanqiang, Zhao Chun, et al. Analysis on lightning performance for catenary of high-speed railway based on electro-geometric model[J]. Power System Technology, 2014, 38(3): 812-816.
[9] 陈维江, 贺恒鑫, 何俊佳, 等. 输电线路雷电先导发展三维仿真模型[J]. 中国电机工程学报, 2014, 34(36): 6601-6612. Chen Weijiang, He Hengxin, He Junjia, et al. On the 3-dimentional leader progression model for the lightning shielding failure performance estimation of overhead transmission lines[J] . Proceedings of the CSEE, 2014, 34(36): 6601-6612.
[10] 王志勇, 余占清, 李雨, 等. 基于先导发展法的特高压直流输电线路绕击特性分析[J]. 高电压技术, 2011, 37(9): 2178-2184. Wang Zhiyong, Yu Zhanqing, Li Yu, et al. Lighting shielding failure characteristics of UHVDC transmission line using leader progress method[J]. High Voltage Engineering, 2011, 37(9): 2178-2184.
[11] 曾嵘, 耿屹楠, 李雨, 等. 高压输电线路先导发展绕击分析模型研究[J]. 高电压技术, 2008, 34(10): 2041-2046. Zeng Rong, Geng Yinan, Li Yu, et al. Lighting shielding failure of transmission line based on leader progress method[J]. High Voltage Engineering, 2008, 34(10): 2041-2046.
[12] ±800kV直流架空输电线路设计规范:GB/T 50790—2013[S]#x000b1#800kV直流架空输电线路设计规范:GB/T 50790—2013[S]. 北京: 中国计划出版社, 2013. |