Transactions of China Electrotechnical Society  2025, Vol. 40 Issue (9): 2809-2826    DOI: 10.19595/j.cnki.1000-6753.tces.242035
Current Issue| Next Issue| Archive| Adv Search |
Configuration Method for Grid-Forming Units of Renewable Energy Grid-Integration System Considering Small Signal Stability Constraints
Sun Peibo, Wang Weisheng, Wang Haijiao, He Guoqing, Sun Yanxia
State Key Laboratory of Renewable Energy Grid-Integration China Electric Power Research Institute Beijing 100192 China

Copyright © Transactions of China Electrotechnical Society
Supported by: Beijing Magtech