Abstract:A new wind farm model#x02014;#x02014;time sequential multi-state model is presented and the fluctuation and sequential characteristics of the wind power are fully taken into account in this model. The optimal dispatch model in the wind integrated power system considering operation reliability is built,which introduces unit commitment risk as the index of the operation reliability into the constraints. Furthermore,a new dispatch strategy involved integrating wind farm is proposed. In the new dispatch strategy,the lowest index of the unit commitment risk without wind power integration is chosen as the upper limit of the operation reliability constraint in the optimal dispatch model. Then,the concept of #x0201c;substitution effect#x0201d; is proposed to describe the effect of the wind farm integration,so the negative effect of the wind power integration can be easily analyzed in the view of operation reliability. The optimal model is solved by the programming tool Cplex and the nonconvex high order mixed integer programming(MIP) model should be converted to convex quadratic MIP model first. The results of the test system show that optimal model and new strategy proposed are correct,effective and the effect of wind power integration on the power system dispatch can be simulated practically.
[1] Chen C L. Optimal wind-thermal generating unit commitment[J]. IEEE Transactions on Energy Conversion, 2008, 23 (1): 273-280. [2] Lee T Y. Optimal spinning reserve for a wind-thermal power system using EIPSO[J]. IEEE Transactions on Power Systems, 2007, 22 (4):1612-1621. [3] 栾士岩, 蒋传文, 张焰, 等. 含风电厂的电力系统节能减排优化调度研究[J]. 华东电力, 2010, 38 (1): 39-43. Luan Shiyan, Jiang Chuanwen, Zhang Yan, et al. Research on optimization dispatching for saving energy and reducing emissions in wind power integrated power system[J]. East China Electric Power, 2010, 38(1): 39-43. [4] 周玮, 彭昱, 孙辉, 等. 含风电场的电力系统动态经济调度[J]. 中国电机工程学报, 2009, 29(25): 13-18. Zhou Wei, Peng Yu, Sun Hui, et al. Dynamic economic dispatch in wind power integrated system[J]. Proceedings of the CSEE, 2009, 29(25): 13-18. [5] Tuohy A, Meibom P, Denny E, et al. Unit commitment for systems with significant wind penetration[J]. IEEE Transactions on Power Systems, 2009, 24 (2): 592-601. [6] Pappala V S, Erlich I, Singh S N. Unit commitment under wind power and demand uncertainties[C]. Joint International Conference on Power System Techno- logy and IEEE Power India Conference, New Delhi (India), 2008: 1-6. [7] 江岳文, 陈冲, 温步瀛. 含风电场的电力系统机组组合问题随机模拟粒子群算法[J]. 电工技术学报, 2009, 24 (6): 129-137. Jiang Yuewen, Chen Chong, Wen Buying. Partical swarm research of stochastic simulation for unit commitment in wind farms integrated power system [J]. Transactions of China Electrotechnical Society, 2009, 24(6): 129-137. [8] Venkatesh B, Yu P, H B Gooi, et al. Fuzzy MILP unit commitment incorporating wind generators[J]. IEEE Transactions on Power System, 2008, 23 (4): 1738-1746. [9] 杨梓俊, 丁明, 孙昕. 电力市场下综合考虑系统可靠性和旋转备用效益的机组组合[J]. 电网技术, 2003, 27(6): 13-18. Yang Zijun, Ding Ming, Sun Xin. Unit commitment problem under the condition of electricity market considering system reliability and benefit from spinning reserve[J]. Power System Technology, 2003, 27(6): 13-18. [10] 孟祥星, 王宏. 大规模风电并网条件下的电力系统调度[J]. 东北电力大学学报, 2009, 29 (1): 1-7. Meng Xiangxin,Wang Hong.Electric system schedu- ling in the condition of synchronization of large-scale wind power[J]. Journal of Northeast Dianli University Natural Science Edition, 2009, 29(1): 1-7. [11] Billinton R, Karki B, Karki R, et al. Unit commitment risk analysis of wind integrated power systems[J]. IEEE Transactions on Power System, 2009, 24 (2): 930-939. [12] Xifan Wang, Huizhu Dai, R J Thomas. Reliability modeling of large wind farms and associated electric utility interface systems[J]. IEEE Transactions on Power Apparatus and System, 1984, 103 (3): 569-575. [13] 张节潭, 程浩忠, 胡泽春, 等. 含风电场的电力系统随机生产模拟[J]. 中国电机工程学报, 2009, 29 (28): 34-39. Zhang Jietan, Cheng Haozhong, Hu Zechun, et al. Power system probabilistic production simulation including wind farms[J]. Proceedings of the CSEE, 2009, 29(28): 34-39. [14] A A Chowdhury. Reliability models for large wind farms in generation system planning[C]. IEEE Power Engineering Society General Meeting, Denver (America), 2005: 1926-1933. [15] Zhaohong Bie, Xin Zou, Zijing Wang, et al. Studies on models and algorithms of the power system probabilistic production simulation integrated with wind farm[C]. IEEE Power and Energy Society General Meeting, Calgary(Canada), 2009: 1-7. [16] Ensslin C, Milligan M, Holttinen H, et al. Current methods to calculate capacity credit of wind power [C]. IEEE Power and Energy Society General Meeting,Pittsburgh(America), 2008: 1-3. [17] 王德生, 胡小正. 电力系统运行可靠性评估[J]. 电网技术, 1988, 6(3): 41-46. Wang Desheng, Hu Xiaozheng. Power system operation reliability evaluation[J]. Power System Technology, 1988, 6(3): 41-46. [18] 周家启, 任震. 电力系统可靠性评估[M]. 重庆: 科学技术文献出版社重庆分社, 1986. [19] 杨莳百, 丁明. 大型电力系统可靠性技术(四)[J]. 电力系统自动化, 1994, 18(1): 58-62. Yang Shibai, Ding Ming. Bulk power system reliability evaluation technology(4)[J]. Automation of Electic Power Systems, 1994, 18(1): 58-62. [20] 王锡凡. 电力系统优化规划[M]. 北京: 水利水电出版社, 1990. [21] 陈皓勇, 王锡凡. 机组组合问题的优化方法综述[J]. 电力系统自动化, 1999, 23 (4): 51-56. Chen Haoyong, Wang Xifan.A survey of optimization- based methods for unit commitment[J]. Automation of Electic Power Systems, 1999, 23(4): 51-56. [22] IEEE RTS Task Force of APM Subcommittee. The IEEE reliabolity test system-1996[J]. IEEE Transac- tions on Power Systems, 1999, 14(3): 1010-1020. [23] Gaing Z L. Discrete partical swarm optimization algorithm for unit commitment[C]. IEEE Power Engineering Society General Meeting, Taiwan(China), 2003: 418-424.