电工技术学报  2019, Vol. 34 Issue (7): 1496-1504    DOI: 10.19595/j.cnki.1000-6753.tces.180448
电力系统 |
电能替代下的城市配电网有载调容配电变压器规划方法
苏宇1, 王强钢1, 雷超2, 周念成1, 黄星3
1. 输配电装备及系统安全与新技术国家重点实验室(重庆大学) 重庆 400044;
2. 国网四川省电力公司天府新区供电公司 成都 610000;
3. 云南电网有限责任公司电力科学研究院 昆明 650217
A Planning Method of On-Load Capacity Regulating Distribution Transformers in Urban Distribution Network after Electric Energy Substitution
Su Yu1, Wang Qianggang1, Lei Chao2, Zhou Niancheng1, Huang Xing3
1. State Key Laboratory of Power Transmission Equipment & System Security and New Technology Chongqing University Chongqing 400044 China;;
2. State Grid Sichuan Electric Power Company Tianfu Power Supply Company Chengdu 610000 China;
3. Yunnan Power Grid Electric Power Research Institute Limited Liability Company Kunming 650217 China
全文: PDF (1972 KB)  
输出: BibTeX | EndNote (RIS)      
摘要 为降低电能替代下城市配电网的配电变压器运行损耗,根据有载调容配电变压器和常规配电变压器的损耗关系推导出有载调容配电变压器更换判据,获得有载调容配电变压器可更换点集合,实现了有载调容配电变压器更换常规配电变压器的初步判断。然后基于有载调容配电变压器更换成本效益分析,建立了电能替代下的城市配电网有载调容配电变压器规划模型,并采用分支定界法在有载调容配电变压器可更换点集合内求解该模型,从而得到电能替代下的城市配电网配电变压器最优规划方案。最后,对某城市配电网电能替代点进行配电变压器规划,以验证该方法的可行性。
服务
把本文推荐给朋友
加入我的书架
加入引用管理器
E-mail Alert
RSS
作者相关文章
苏宇
王强钢
雷超
周念成
黄星
关键词 电能替代城市配电网有载调容配电变压器规划方法    
Abstract:To reduce operation loss of distribution transformers in urban distribution network after electric energy substitution, this paper proposed a criterion of replacing with on-load capacity regulating distribution transformers, according to the relationship between conventional distribution transformer loss and on-load capacity regulating distribution transformer loss. And the distribution transformer replaceable point set was obtained, realizing preliminary judgment of replacing conventional distribution transformers with on-load capacity regulating distribution transformers. Then, based on cost-benefit analysis, the planning model of on-load capacity regulating distribution transformers in urban distribution network after electric energy substitution was established. The model was solved by branch and bound method within distribution transformer replaceable point set, so as to obtain optimal distribution transformer planning scheme. Finally, the distribution transformer planning of substitution points in an urban distribution network was carried out to verify the feasibility of this method.
Key wordsElectric energy substitution    urban distribution network    on-load capacity regulating distribution transformer    planning method   
收稿日期: 2018-03-29      出版日期: 2019-04-17
PACS: TM421  
基金资助:国家自然科学基金(51607015)和重庆市科技计划(cstc2015jcyjBX0033)资助项目
作者简介: 王强钢男,1987年生,博士,讲师,研究方向为电力系统自动化和电能质量。E-mail:yitagou@cqu.edu.cn
引用本文:   
苏宇, 王强钢, 雷超, 周念成, 黄星. 电能替代下的城市配电网有载调容配电变压器规划方法[J]. 电工技术学报, 2019, 34(7): 1496-1504. Su Yu, Wang Qianggang, Lei Chao, Zhou Niancheng, Huang Xing. A Planning Method of On-Load Capacity Regulating Distribution Transformers in Urban Distribution Network after Electric Energy Substitution. Transactions of China Electrotechnical Society, 2019, 34(7): 1496-1504.
链接本文:  
https://dgjsxb.ces-transaction.com/CN/10.19595/j.cnki.1000-6753.tces.180448          https://dgjsxb.ces-transaction.com/CN/Y2019/V34/I7/1496