电工技术学报  2019, Vol. 34 Issue (7): 1496-1504    DOI: 10.19595/j.cnki.1000-6753.tces.180448
电力系统 |
电能替代下的城市配电网有载调容配电变压器规划方法
苏宇1, 王强钢1, 雷超2, 周念成1, 黄星3
1. 输配电装备及系统安全与新技术国家重点实验室(重庆大学) 重庆 400044;
2. 国网四川省电力公司天府新区供电公司 成都 610000;
3. 云南电网有限责任公司电力科学研究院 昆明 650217
A Planning Method of On-Load Capacity Regulating Distribution Transformers in Urban Distribution Network after Electric Energy Substitution
Su Yu1, Wang Qianggang1, Lei Chao2, Zhou Niancheng1, Huang Xing3
1. State Key Laboratory of Power Transmission Equipment & System Security and New Technology Chongqing University Chongqing 400044 China;;
2. State Grid Sichuan Electric Power Company Tianfu Power Supply Company Chengdu 610000 China;
3. Yunnan Power Grid Electric Power Research Institute Limited Liability Company Kunming 650217 China