Analysis on Wind Power Curtailment at Frequency Adjustment Level
Tian Shuxin1, Cheng Haozhong1, Zeng Pingliang2, Liu Lu1, Wang Kan1, Ma Zhoujun1
1.Key Laboratory of Control of Power Transmission and Conversion Ministry of Education (Shanghai Jiao Tong University) Shanghai 200240 China; 2.China Electric Power Research Institute Beijing 100192 China
Abstract:Wind power curtailment has been one of the key restricting factors behind the development of the wind power industry.The main reasons for wind power curtailment are inadequate peak and frequency adjustment capability as well as inadequate transmission capacity.As seen from the aspect of the frequency adjustment,the active power output of the wind farm should be reduced step by step according to the command from the dispatch department of the power grid when the grid frequency exceeds the upper limit.To study urgent wind power curtailment at the minute-level,the most appropriate shedding method for wind generators is selected based on the frequency adjustment sensitivity index of wind generators’ tripping as lopsided power exists.Typical difficult time intervals of the frequency adjustment are chosen according to the relationship between frequency overshoot time and load variation.Combined with the above wind generator tripping strategies,annual wind power curtailment in the planning scheme at the frequency adjustment level is estimated.Based on DIgSILENT/PowerFactory software,a certain regional power network planning in China of 2020 is used to verify the correctness and validity of the proposed method.
田书欣, 程浩忠, 曾平良, 柳璐, 王侃, 马洲俊. 基于调频层面的风电弃风分析[J]. 电工技术学报, 2015, 30(7): 18-26.
Tian Shuxin, Cheng Haozhong, Zeng Pingliang, Liu Lu, Wang Kan, Ma Zhoujun. Analysis on Wind Power Curtailment at Frequency Adjustment Level. Transactions of China Electrotechnical Society, 2015, 30(7): 18-26.
[1] 国家电网公司企业标准:Q/GDW392-2009,风电场接入电网技术规定[S]. [2] Moyano C F,Lopes J A P.Unit commitment and dispatch strategies for a wind park[C].International Conference on Power Engineering,Energy and Electrical Drives,Setubal,Portugal,2007:12-17. [3] 邹见效,李丹,郑刚,等.基于机组状态分类的风电场有功功率控制策略[J].电力系统自动化,2011,35(24):28-32. Zou Jianxiao,Li Dan,Zheng Gang,et al.An active power control scheme for wind farms based on state classification algorithm[J].Automation of Electric Power Systems,2011,35(24):28-32. [4] Burke D J,O’Malley M J.Transmission connected wind curtailment with increasing wind capacity connection[C].IEEE Power & Energy Society General Meeting,Calgary,AB,2009:1-5. [5] Burke Daniel J,O’Malley M J.Factors Influencing Wind Energy Curtailment[J].IEEE Transactions on Sustainable Energy,2011,2(2):185-193. [6] 刘新东,方科,陈焕远,等.利用合理弃风提高大规模风电消纳能力的理论研究[J].电力系统保护与控制,2012,40(6):35-39. Liu Xindong,Fang Ke,Chen Huanyuan,et al.Research on rational wind power casting theory for large-scale wind power integration improvement[J].Power System Protection and Control,2012,40(6):35-39. [7] 侯婷婷,娄素华,吴耀武,等.含大型风电场的电力系统调峰运行特性分析[J].电工技术学报,2013,28(5):105-111. Hou Tingting,Lou Suhua,Wu Yaowu,et al.Analysis on peak load regulation operation characteristics of power system integrated with large-scale wind power[J].Transactions of China Electrotechnical Society,2013,28(5):105-111. [8] Zhang Ning,Kang Chongqing,Kirschen D S,et al.Planning pumped storage capacity for wind power integration[J].IEEE Transactions on Sustainable Energy,2013,4(2):393-401. [9] 吴子双,于继来,彭喜云.高风速段次优功率追踪方式的风电调频方法[J].电工技术学报,2013,28(5):112-119. Wu Zishuang,Yu Jilai,Peng Xiyun.DFIG’s frequency regulation method only for high wind speed with suboptimal power tracking[J].Transactions of China Electrotechnical Society,2013,28(5):112-119. [10]Haque M E,Paul S,Sheikh M R I.Grid frequency analysis with the issue of high wind power penetration[C].International Conference on Electrical Information and Communication Technology (EICT),Khulna,2014:1-7. [11]Vaidya A,Chowdhury B H,Chamana M. Enabling wind power plants with frequency and voltage regulation capability by forced curtailment[C].North American Power Symposium (NAPS),Champaign,IL,USA,2012:1-6. [12]Klein S A.Accomodating wind power variability by real-time adjustment of controllable loads[C].IEEE Power and Energy Society General Meeting,Pittsburgh,PA,USA,2008:1-5. [13]Gu Yingzhong,Xie Le.Fast sensitivity analysis approach to assessing congestion induced wind curtailment[J].IEEE Transactions on Power Systems,2014,29(1):101-110. [14]Benidris Mohammed,Mitra Joydeep.Reliability and sensitivity analysis of composite power systems under emission constraints[J].IEEE Transactions on Power Systems,2014,29(1):404-412. [15]洪芦诚,石立宝,姚良忠,等.计及风电场发电功率不确定性的电力系统模糊潮流[J].电工技术学报,2010,25(8):116-122. Hong Lucheng,Shi Libao,Yao Liangzhong,et al.Fuzzy modelling and solution of load flow incorporating uncertainties of wind farm generation[J].Transactions of China Electrotechnical Society,2010,25(8):116-122. [16]荆朝霞,胡仁.电能质量评估灵敏度分析及在改进密切值法中的应用[J].电力系统保护与控制,2013,41(9):60-66. Jing Zhaoxia,Hu Ren.Sensitivity analysis for power quality evaluation and its application in modified close value method[J].Power System Protection and Control,2013,41(9):60-66. [17]Hu Wei,Dong Shimeng,Lu Qiuyu,et al.Coordinated optimizing control strategy between power generators and power grid in Inner Mongolia[C]. Universities Power Engineering Conference,London UK,2012:1-7. [18]刘畅,吴浩,高长征,等.风电消纳能力分析方法的研究[J].电力系统保护与控制,2014,42(4):61-66. Liu Chang,Wu Hao,Gao Changzheng,et al.Study on analysis method of accommodated capacity for wind power[J].Power System Protection and Control,2014,42(4):61-66. [19]Wang-Hansen M,Josefsson R,Mehmedovic H.Frequency controlling wind power modeling of control strategies[J].IEEE Transactions on Sustainable Energy,2013,4(4):954-959. [20]Kalantari A,Galiana F D.The impact of wind power variability and curtailment on ramping requirements[C].IEEE/PES Transmission and Distribution Conference and Exposition,Sao Paulo,USA,2010:133-138. [21]吕泉,王伟,韩水,等.基于调峰能力分析的电网弃风情况评估方法[J].电网技术,2013,37(7):1887-1894. Lv Quan,Wang Wei,Han Shui,et al.A new evaluation method for wind power curtailment based on analysis of system regulation capability[J].Power System Technology,2013,37(7):1887-1894.