Doubly-Fed Induction Generator Wind Farm Aggregated Model Based on Crowbar and Integration Simulation Analysis
Wang Zhenshu1,Liu Yan2,Lei Ming3,Bian Shaorun4,Shi Yunpeng1
1. School of Electrical Engineering Shandong University Jinan 250061 China; 2. Qingdao Power Supply Company of National Grid Qingdao 266100 China; 3. Dispatch and Control Center, State Grid Shandong Electric Power Corporation Jinan 250001 China; 4. Licheng Power Supply Company of National Grid Licheng 250100 China
Abstract:The low voltage ride-through issue is an urgent problem for doubly-fed induction generator(DFIG) wind farm integration. Thus, a DFIG wind farm aggregation method based on the crowbar is proposed in this paper. Through analyzing the mechanism of DFIG during grid fault, the equation of DFIG rotor current is calculated. Activation of the crowbar can be determined by the DFIG rotor current, and then the wind generators can be aggregated into two equivalent models based on the condition that the crowbar is activated or not. Capacity-weighted method is used to calculate the parameters of each equivalent model. The DFIG wind farm two-machine model can be built. Simulation analysis is carried out to demonstrate that the proposed method can better reflect the changes of wind farm caused by the activation of crowbar of part of DFIGs, compared with a single generator aggregated model. The wind farm low voltage ride-through is enhanced using fast response reactive power compensator.
王振树,刘岩,雷鸣,卞绍润,石云鹏. 基于Crowbar的双馈机组风电场等值模型与并网仿真分析[J]. 电工技术学报, 2015, 30(4): 44-51.
Wang Zhenshu,Liu Yan,Lei Ming,Bian Shaorun,Shi Yunpeng. Doubly-Fed Induction Generator Wind Farm Aggregated Model Based on Crowbar and Integration Simulation Analysis. Transactions of China Electrotechnical Society, 2015, 30(4): 44-51.
[1] Ullah N R, Thiringer T, Karlsson D. Voltage and transient stability support by wind farms complying with the E. ON Netz grid code[J]. IEEE Transactions on Power Systems, 2007, 22(4): 1647-1656. [2] 叶希, 鲁宗相, 乔颖, 等. 大规模风电机组连锁脱网事故机理初探[J]. 电力系统自动化, 2012, 36(8): 11-17. Ye Xi, Lu Zongxiang, Qiao Ying, et al. A primary analysis on mechanism of large scale cascading trip- off of wind turbine generators[J]. Automation of Electric Power Systems, 2012, 36(8): 11-17. [3] 贺益康, 周鹏. 变速恒频双馈异步风力发电系统低电压穿越技术综述[J]. 电工技术学报, 2009, 24(9): 141-146. He Yikang, Zhou Peng. Overview of the low voltage ride-through technology for variable speed constant frequency doubly fed wind power generation systems [J]. Transactions of China Electrotechnical Society, 2009, 24(9): 141-146. [4] 李建林, 许洪华. 风力发电系统低电压运行技术[M]. 北京: 机械工业出版社, 2008. [5] Sheng Hu, Xinchun Lin, Yong Kang, et al. An improved low-voltage ride-through control strategy of doubly fed induction generator during grid faults[J]. IEEE Transactions on Power Electronics, 2011, 26(12): 3653-3665. [6] Vidal J, Abad G, Arza J, et al. Single-phase DC Crowbar topologies for low voltage ride through fulfillment of high-power doubly fed induction generator-based wind turbines[J]. IEEE Transactions on Energy Conversion, 2013, 28(3): 768-781. [7] Sulla F, Svensson J, Samuelsson O. Short-circuit analysis of a doubly fed induction generator wind turbine with direct current chopper protection[J]. Wind Energy, 2013, 16(1): 37-49. [8] Li Wang, Chia-Tien Hsiung. Dynamic stability improve- ment of an integrated grid-connected offshore wind farm and marine-current farm using a STATCOM[J]. IEEE Transactions on Power Systems, 2011, 26(2): 690-698. [9] Shafiu A, Anaya-Lara O, Bathurst G. Aggregated wind turbine models for power system dynamic studies[J]. Wind Engineering, 2006, 30(3): 171-186. [10] Trudnowski D J, Gentile A, Khan J M. Fixed-speed wind-generator and wind-park modeling for transient stability studies[J]. IEEE Transactions on Power Systems, 2004, 19(4): 1911-1917. [11] 孙建锋, 焦连伟, 吴俊玲, 等. 风电场发电机动态等值问题的研究[J]. 电网技术, 2004, 28(7): 58-61. Sun Jianfeng, Jiao Lianwei, Wu Junling, et al. Research on multi-machine dynamic aggregation in wind farm [J]. Power System Technology, 2004, 28(7): 58-61. [12] Li H, Yang C, Zhao B, et al. Aggregated models and transient performances of a mixed wind farm with different wind turbine generator systems[J]. Electric Power Systems Research, 2012, 92(11): 1-10. [13] 米增强, 苏勋文, 杨奇逊, 等. 风电场动态等值模型的多机表征方法[J]. 电工技术学报, 2010, 25(5): 162-169. Mi Zengqinag, Sun Xunwen, Yang Qijun. Multi- machine representation method for dynamic equivalent model of wind farms[J]. Transactions of China Electro- technical Society, 2010, 25(5): 162-169. [14] Vladislav Akhmatov, Hans Knudsen. An aggregate model of a grid-connected, large-scale, offshore wind farm for power stability investigations—importance of windmill mechanical system[J]. International Journal of Electrical Power & Energy Systems, 2002, 24(9): 709-717. [15] 米增强, 苏勋文, 余洋, 等. 双馈机组风电场动态等效模型研究[J]. 电力系统自动化, 2010, 34(17): 72-76. Mi Zengqinag, Sun Xunwen, Yu Yang. Study on dynamic equivalence model of wind farms with turbine driven doubly fed induction generator[J]. Automation of Electric Power Systems, 2010, 34(17): 72-76. [16] Mohsen Rahimi, Mostafa Parniani. Grid-fault ride- through analysis and control of wind turbines with doubly fed induction generators[J]. Electric Power Systems Research, 2010, 80(2): 184-195. [17] Lopez J, Sanchis P, Roboam X, et al. Dynamic behavior of the doubly fed induction generator during three-phase voltage dips[J]. IEEE Transactions on Energy Conversion, 2007, 22(3): 709-717. [18] 贺益康, 胡家兵, 徐烈. 并网双馈异步风力发电机运行控制[M]. 北京: 中国电力出版社, 2011. [19] 迟永宁. 大型风电场接入电网的稳定性问题研究[D]. 北京: 中国电力科学研究院, 2006. [20] Shafiu A, Anaya-Lara O, Bathurst G. Aggregated wind turbine models for power system dynamic studies[J]. Wind Engineering, 2006, 30(3): 171-186. [21] Hagkwen Kim, Chanan Singh, Alex Sprintson. Simula- tion and estimation of reliability in a wind farm considering the wake effect[J]. IEEE Transactions on Sustainable Energy, 2012, 3(2): 274-282.