Reliability Optimal Distribution for HVDC Systems Using Bisection Method
Xie Kaigui1, Wu Tao1, Huang Ying2, Jian Hongyu3, Hu Bo1, Li Xiaolin2, Wang Libin1
1. State Key Laboratory of Power Transmission Equipment and System Security and New Technology Chongqing University Chongqing 400044 China 2. China Southern Power Grid Technology Research Center Guangzhou 510623 China 3. China Southern Power Grid EHV Power Transmission Company Guangzhou 510620 China
Abstract:Reliability optimal distribution (ROD) for high voltage direct current (HVDC) transmission systems can be used to choose reliability parameters of components to meet the requirement of a pre-specified system reliability performance. It is becoming an important means of decision-making for HVDC transmission project of bidding, planning and designing processes. Based on the property of the system reliability increasing with the reliability performance of components, this paper proposes a non-linear programming model for the ROD, which considers a wide range of constraints including the pre-specified system reliability. This model can be solved using the bisection method. Therefore, the optimal reliability parameters of components can be obtained. Case study of a HVDC transmission system of single 12-pulse was used to illustrate the performance of the proposed algorithm. A wide range of system reliability indices including the forced energy unavailability (FEA) and monopole forced outage times (MUOT) are the pre-specified indices. Results from the case study show that the method is feasible and effective.
谢开贵, 吴韬, 黄莹, 简洪宇, 胡博, 黎小林, 王立斌. 基于二分法的高压直流输电系统可靠性最优分解[J]. 电工技术学报, 2010, 25(5): 149-154.
Xie Kaigui, Wu Tao, Huang Ying, Jian Hongyu, Hu Bo, Li Xiaolin, Wang Libin. Reliability Optimal Distribution for HVDC Systems Using Bisection Method. Transactions of China Electrotechnical Society, 2010, 25(5): 149-154.
[1] 赵畹君. 高压直流输电工程技术[M]. 北京: 中国电力出版社, 2004. [2] 周家启, 陈炜骏, 谢开贵, 等. 高压直流输电系统可靠性灵敏度分析模型[J]. 电网技术, 2007, 31(19): 18-23. [3] 任震, 武娟. 高压直流输电可靠性评估的等效模 型[J]. 电力系统自动化, 1999, 23(9): 38-41. [4] 黄雯莹, 任震. 高压直流输电可靠性评估的FD 法[J]. 重庆大学学报, 1985(1): 9-17. [5] 李海泉, 李刚. 系统可靠性分析与设计[M]. 北京: 科学出版社, 2003 . [6] Kartik S, Siva Ram Murthy C. Improved tashallocation algorithms to maximize reliability of redundant distributed computing system[J]. IEEE Transactions on Reliability, 1995, 44(4): 575-586. [7] Kartik S, Siva Ram Murthy C. Task allocation algorithms for maximizing reliability of distributed computing systems[J]. IEEE Transactions on Computers, 1997, 46(6): 719-724. [8] Shatz S M, Wang Jiaping. Task allocation for maximizing reliability of distributed computers systems[J]. IEEE Transactions on Computers, 1982, 41: 1156-1168. [9] Wang Jiaping, Sol M Shatz. Task allocation for optimized system reliability[C]. Proceedings of Seventh Symposium on Reliable Distributed Systems, 1988: 82-90. [10] Shatz S M, Wang Jiaping. Model and algorithm for reliability-oriented task allocation in redundant distributed computer systems[J]. IEEE Transatcions on Reliability, 1989, 38: 16-27. [11] Sastry Kuruganty. Effect of HVDC component enhancement on the overall reliability performance[J]. IEEE Transactions on Power Delivery, 1994, 9(1): 343-351. [12] Kuruganty P R S. A reliability cost-benefit analysis for HVDC transmission expansion planning[J]. IEEE Transactions on Power Delivery, 1988, 3(3): 1241- 1248. [13] Li Wenyuan. Probability distribution of HVDC capacity considering repairable and aging failures[J]. IEEE Transactions on Power Delivery, 2006, 21(1): 523-525. [14] Li Wenyuan. A risk evaluation based approach to replacement strategy of aged HVDC components and its application at BCTC[J]. IEEE Transactions on Power Delivery, 2007, 22(3): 1834-1840. [15] 任震, 万国成. 高压直流输电系统最优部件数的数学模型研究[J]. 电力自动化设备, 2002, 22(2): 8-10. [16] Working Group of 04 GIGRE study committee. Protocol for reporting the operational performance of HVDC transmission systems[R]. 1997. [17] Availability and reliability study report (Guizhou- Guangdong±500kV DC transmission project)[R]. SIEMENS, 01DEPJY44, 2002.