Model for Electric Energy Production of Hydropower Plants Based on Reservoir Energy
Wu Jiekang1, Guo Zhuangzhi1, Zhu Yunan1, Qin Lihan2, Ning Lin3
1.Guangxi University Nanning 530004 China 2.Electric Power Research Institute of North China Beijing 100045 China 3.Beijing Super-High Voltage Company Beijing 100045 China
Abstract:This paper presents a modelling method for elctric energy production of hydroelectric plants and hydro-mechanical-electric coupling of large-scale reservoir. According to the law of conservation of energy, a hydro-mechanical-electric coupling model was constructed to formulate the electric energy converted from kinectic energy, potential energy, pressure energy and the reservoir energy. Reservoir energy is analyzed by such way, in which water body of reservoir is divided into multiple levels due to the shape of the bottom of the reservoir. By using the priciple of force analysis and energy conversion. The dynamic characteristics of instant power rate of hydropower-diven generator is studied for different factors, such as penstock angle, reservoir adjustment ability, reservoir water body, and maximal usage hours and so on. Some examples are employed to illustrate the feasiblility of the proposed method, and the simulation results shows that it could provide theory basis for the hydropower plant construction, economic operation and high effective utilization and transformation of hydro-energy.
吴杰康, 郭壮志, 祝宇楠, 秦砺寒, 宁琳. 基于水库能的水电站发电模型[J]. 电工技术学报, 2009, 24(11): 149-156.
Wu Jiekang, Guo Zhuangzhi, Zhu Yunan, Qin Lihan, Ning Lin. Model for Electric Energy Production of Hydropower Plants Based on Reservoir Energy. Transactions of China Electrotechnical Society, 2009, 24(11): 149-156.
[1] IEEE working group. Hgdraulic turbine and turbine control models for system dynamic studies[J]. IEEE Trans. on Power Systems, 1992, 7(1): 167-179. [2] Souza O H, Barbieri N. Study of hydraulic transients in hydropower plants through simulation of nonlinear model of penstock and hydraulic turbine model [J]. IEEE Trans. on Power Systems, 1999, 14(4): 1269- 1272. [3] 卫志农, 陈剑光, 潘学萍, 等. 水机电系统相互作用研究[J]. 电力系统自动化, 2000, 25(12): 26-29. [4] 潘学萍, 鞠平, 卫志农, 等. 水力系统对低频振荡的影响[J]. 电力系统自动化, 2002, 10(2): 24-27. [5] 陈舟, 陈寿孙, 张中华, 等. 水力系统模型对电力系统暂态稳定分析的影响[J]. 清华大学学报(自然科学版), 1997, 6(7): 13-18. [6] 李艳军, 刘宪林. 考虑水力系统详细模型的电力系统暂态过程仿真[J]. 电网技术, 2005, 29(8): 61-64. [7] 尚金成, 张勇传, 岳子忠, 等. 梯级电站短期优化运行的新模型及其最优性条件[J]. 水电能源科学, 1998, 16(3): 1-9. [8] Lyra C, Ferreira L R M. A multiobjective approach to the short-term scheduling of a hydroelectric power system[J]. IEEE Trans. on Power Systems, 1995, 10(4): 1750-1755. [9] Andre Turgeon. Daily operation of reservoir subject to yearly probabilistic constraints[J]. Journal of Water Resources Planning and Management, 2005, 10(9): 342-350. [10] Naresh R, Sharma J. Hydro system scheduling using ANN aproach[J]. IEEE Trans. on Power Systems, 2000, 15(1): 388-395. [11] 袁晓辉, 袁艳斌, 权先璋, 等. 基于混沌进化算法的梯级水电系统短期发电计划[J]. 电力系统自动化, 2001, 25(8):34-38. [12] 王金文, 袁晓辉, 张勇传. 随机动态规划在三峡梯级长期发电优化调度中的应用[J]. 电力自动化设备, 2002, 22(8): 54-56. [13] Chang G W, Aganagic M, Waight J G, et al. Experiences with mixed integer linear programming based approaches on short-term hydro scheduling[J]. IEEE Trans. on Power Systems, 2001, 16(4): 743- 749. [14] Arnold E, Tatjewski P, Wolochowicz P. Two methods for large-scale nonlinear optimization and their comparison on a case study of hydropower optimization[J]. Journal of Optimization Theory and Applications, 1994, 81(2): 221-248. [15] 罗益民, 余燕. 大学物理(上)[M]. 北京: 北京邮电大学出版社, 2004.