Abstract:In probabilistic production simulation,load fluctuation leads to start-up/shut-down operations and related dynamic cost. Frequency and duration(FD) method can deal with the fluctuation and some indices are got from it,but for the consideration of infeasible start-up/shut-down operations of a generator in short time interval,FD method gets a result with error. With the increasing penetration of intermittent source of energy such as wind power,increased fluctuation of net load will have more impact. For more reasonable results,the concept of load duration curve is extended to interval frequency distribution and interval frequency distribution series in this paper,with consideration of the frequency information and time distribution information of load fluctuation. And a probabilistic production simulation method based on equivalent interval frequency distribution is proposed. EPRI-36 unit sample verifies the effectiveness of the proposed method.
谈天夫,高山,李海峰,罗建裕. 基于等效间隔-频率分布的含风电场电力系统随机生产模拟[J]. 电工技术学报, 2014, 29(12): 148-157.
Tan Tianfu,Gao Shan,Li Haifeng,Luo Jianyu. Power System Probabilistic Production Simulation Based on Equivalent Interval Frequency Distribution Including Wind Farms. Transactions of China Electrotechnical Society, 2014, 29(12): 148-157.
[1] 胡国伟,别朝红,王锡凡. 考虑运行可靠性的含风电电力系统优化调度[J]. 电工技术学报,2013,28(5): 58-65. Hu Guowei,Bie Zhaohong,Wang Xifan. Optimal dispatch in wind integrated system considering operation reliability[J]. Transactions of China Electrotechnical Society,2013,28(5): 58-65. [2] 张宁宇,高山,赵欣. 一种考虑风电随机性的机组组合模型及其算法[J]. 电工技术学报,2013,28(5): 22-29. Zhang Ningyu,Gao Shan,Zhao Xin. An unit commitment model and algorithm with randomness of wind power[J]. Transactions of China Electrotechnical Society,2013,28(5): 22-29. [3] 袁建党,袁铁江,晁勤,等. 电力市场环境下大规模风电并网系统电源规划研究[J]. 电力系统保护与控制,2011,39(5): 22-26. Yuan Jiandang,Yuan Tiejiang,Chao Qin,et al. Study of generation expansion planning of the power system incorporating large-scale wind power in the environment of electricity market[J]. Power System Protection and Control,2011,39(5): 22-26. [4] 雷亚洲,王伟胜,印永华,等. 风电对电力系统运行的价值分析[J]. 电网技术,2002,26(5): 10-14. Lei Yazhou,Wang Weisheng,Yin Yonghua,et al. Analysis of wind power value to power system operation[J]. Power System Technology,2002,26(5): 10-14. [5] 鲍爱霞. 大规模风电场容量可信度的分析及对华东电网备用的影响[J]. 中国电机工程学报,2009,29(增刊): 34-38. Bao Aixia. Analysis and research for capacity credit of large scale wind farms and influence on reserve capacity of east china electric power grid[J]. Procee- dings of the CSEE,2009,29(Sup.): 34-38. [6] 柳进,于继来,柳焯. 针对风电间歇性扰动的旋转备用智能优化调度策略[J]. 中国电机工程学报,2013,33(1): 163-170. Liu Jin,Yu Jilai,Liu Zhuo. An intelligent optimal dispatch strategy for spinning reserve coping with wind intermittent disturbance[J]. Proceedings of the CSEE,2013,33(1): 163-170. [7] 王锡凡,王秀丽. 随机生产模拟及其应用[J]. 电力系统自动化,2003,27(8): 10-15. Wang Xifan,Wang Xiuli. Probabilistic production simulation method and its application[J]. Automation of Electric Power Systems,2003,27(8): 10-15. [8] Billinton R,Li W. A Monte Carlo method for multi- area generation system reliability assessment[J]. IEEE Transactions on Power Systems,1992,7(4): 1487-1492. [9] 赵渊,周家启,刘志宏. 大电网可靠性的序贯和非序贯蒙特卡洛仿真的收敛性分析及比较[J]. 电工技术学报,2009,24(11): 127-133. Zhao Yuan,Zhou Jiaqi,Liu Zhihong. Convergence analysis and comparison of sequential and nonsequential Monte-Carlo simulation for bulk power system relia- bility assessment[J]. Transactions of China Electrotech- nical Society,2009,24(11): 127-133. [10] 吴义纯,丁明,李生虎. 风电场对发输电系统可靠性影响的评估[J]. 电工技术学报,2004,19(11): 72-76. Wu Yichun,Ding Ming,Li Shenghu. Reliability assessment of wind farms in generation and transmission systems[J]. Transactions of China Electrotechnical Society,2004,19(11): 72-76. [11] 王剑,刘天琪,李兴源. 风电场及储能装置对发输电系统可靠性的影响[J]. 电网技术,2011,35(5): 165-170. Wang Jian,Liu Tianqi,Li Xingyuan. Influences of connecting wind farms and energy storage devices to power grid on reliability of power generation and transmission system[J]. Power System Technology,2011,35(5): 165-170. [12] 夏清,王少军,相年德. 时序负荷曲线下电力系统概率性生产模拟[J]. 中国电机工程学报,1994,14(3): 21-28. Xia Qing,Wang Shaojun,Xiang Niande. The proba- bilistic power system production simulation based on chronological load curve[J]. Proceedings of the CSEE,1994,14(3): 21-28. [13] 邹斌,李冬. 基于有效容量分布的含风电场电力系统随机生产模拟[J]. 中国电机工程学报,2012,32(7): 23-31. Zou Bin,Li Dong. Power system probabilistic production simulation with wind generation based on available capacity distribution[J]. Proceedings of the CSEE,2012,32(7): 23-31. [14] Michael G. The inclusion of dynamic factors in statistical power system cost models,part I: assessment of start-up and banking costs[J]. IEEE Transactions on Power Systems,1989,4(2): 419-425. [15] Malik A S,Cory B J. An application of frequency and duration approach in generation planning[J]. IEEE Transactions on Power Systems,1997,12(3): 1076- 1084. [16] Malik A S. Simulating limited energy units within the framework of ELDC and FD methods[J]. Electrical Power & Energy Systems,2004,26(8): 645-653. [17] 张节潭,程浩忠,胡泽春,等. 含风电场的电力系统随机生产模拟[J]. 中国电机工程学报,2009,29(28): 34-39. Zhang Jietan,Cheng Haozhong,Hu Zechun,et al. Power system probabilistic production simulation including wind farms[J]. Proceedings of the CSEE,2009,29(28): 34-39. [18] 曲翀,王秀丽,谢绍宇,等. 含风电电力系统随机生产模拟的改进算法[J]. 西安交通大学学报,2012,46(6): 115-121. Qu Chong,Wang Xiuli,Xie Shaoyu,et al. Improved algorithm for probabilistic production simulation of power systems with wind power[J]. Journal of Xi’an Jiaotong University,2012,46(6): 115-121. [19] Wang X. Equivalent energy function approach to power system probabilistic modeling[J]. IEEE Transac- tions on Power Systems,1988,3(3): 823-829. [20] 王锡凡. 电力系统随机生产模拟的等效电量函数法[J]. 西安交通大学学报,1984,18(6): 13-26. Wang Xifan. EEF approach to power system proba- bilistic modeling[J]. Journal of Xi’an Jiaotong Univer- sity,1984,18(6): 13-26. [21] The Reliability Test System Task Force of the Application of Probability Methods Subcommittee. IEEE reliability test system [J]. IEEE Transactions on Power Apparatus and Systems,1979,98(6): 2047- 2054.