电工技术学报  2014, Vol. 29 Issue (12): 120-127    DOI:
新能源电力系统 |
考虑并网光伏电源出力时序特性的配电网无功规划
陈丽1,张晋国1,苏海锋2
1.河北农业大学机电工程学院保定071001
2.华北电力大学电气与电子工程学院保定071003
Reactive Power Planning for Distribution System with Grid-Connected Photovoltaic System Considering Time-Sequence Characteristics
Chen Li1,Zhang Jinguo1,Su Haifeng2
1. Agricultural University of Hebei Baoding 071001 China
2. North China Electric Power University Baoding 071003 China