Office Online  
  Journal Online
    Current Issue
    Advanced Search
    Archive
    TOP Read
    TOP Download
Other articles related with "TM63":
254 Ji Jianfei,Yuan Yubo,ang Lihui,Bu Qiangsheng
  Analysis and Countermeasure on Abnormal Operation of One 110kV Intelligent Substation Merging Unit
    Transactions of China Electrotechnical Society   2015 Vol.30 (16): 254-259 [Abstract] (467) [HTML 1 KB] [PDF 0 KB] (128)
441 Xu Xiaoning
  Reliability Assessment and Optimization of Main Electrical Connection of Substation
    Transactions of China Electrotechnical Society   2015 Vol.30 (12): 441-446 [Abstract] (363) [HTML 1 KB] [PDF 191 KB] (1608)
253 Fu Zhihong, Yu Cigong, Hou Xingzhe, Zhang Huiqing, Qin Shanqiang
  Transient Electromagnetic Apparent Resistivity Imaging for Break Point Diagnosis of Grounding Grids
    Transactions of China Electrotechnical Society   2014 Vol.29 (9): 253-259 [Abstract] (475) [HTML 1 KB] [PDF 1145 KB] (2653)
245 Liu Xiaosheng, Pang Jiwei, Xu Dianguo, Zhang Pengyu, Zhao Zhenfeng
  Research on the Reliability and Real-Time of Process Layer GOOSE Network Scheme in Smart Substation Based on Spider Web Topology Structure
    Transactions of China Electrotechnical Society   2013 Vol.28 (1增): 245-250 [Abstract] (702) [HTML 0 KB] [PDF 784 KB] (1721)
77 Zhang Zhongyuan, Xu Zhiniu, Lü Fangcheng, Yang Bin
  High Frequency Passivity Circuit Model of Potential Transformers
    Transactions of China Electrotechnical Society   2012 Vol.27 (4): 77-82 [Abstract] (439) [HTML 1 KB] [PDF 363 KB] (1661)
147 Zhu Lin, Chen Jinfu, Duan Xianzhong
  Improvement of Redundant Architecture in Digital Substation and Its Reliability & Economic Assessment
    Transactions of China Electrotechnical Society   2009 Vol.24 (10): 147-151 [Abstract] (402) [HTML 1 KB] [PDF 502 KB] (1779)
First page | Prev page | Next page | Last pagePage 1 of 1, 6 records
Copyright © Transactions of China Electrotechnical Society
Supported by: Beijing Magtech