Transactions of China Electrotechnical Society  2023, Vol. 38 Issue (21): 5781-5793    DOI: 10.19595/j.cnki.1000-6753.tces.221206
Current Issue| Next Issue| Archive| Adv Search |
Medium- and Long-Term Double-Layer Nested Optimal Scheduling of Hydro-PV Complementary System Considering Short-Term Power Fluctuation and Curtailment Risk
Xianyu Hucheng1, Huang Xianfeng1, Zhang Yanqing2, Li Xu3, Xu Chang4
1. College of Water Conservancy and Hydropower Engineering Hohai University Nanjing 210098 China;
2. Power China Guiyang Engineering Corporation Limited Guiyang 550081 China;
3. Huaneng Lancang River Hydropower Inc. Kunming 650214 China;
4. College of Energy and Electrical Engineering Hohai University Nanjing 210098 China

Copyright © Transactions of China Electrotechnical Society
Supported by: Beijing Magtech