Transactions of China Electrotechnical Society  2020, Vol. 35 Issue (19): 3996-4008    DOI: 10.19595/j.cnki.1000-6753.tces.200259
Current Issue| Next Issue| Archive| Adv Search |
The Optimal Working Time of Battery Storage Power Station Improving Power Grid Transient Stability Based on Extended Equal Area Criteria Rule
Sun Peidong1,2, Li Peiqiang1,2, Cao Pengcheng1,2, Deng Huiqiong1,2