A Method to Choose Fault Time for Relay Setting Value Verification of Converter Protection in HVDC Systems |
Zhu Jia, Li Yinhong, Duan Xianzhong |
State Key Laboratory of Advanced Electromagnetic Engineering and Technology chool of Electrical and Electronic Engineering Huazhong University of Science and Technology Wuhan 430074 China |
|
|
Abstract The correctness of converter protection setting values can be influenced by the time of fault occurrence. The method of selecting the fault time based on natural periods, which is commonly utilized in engineering practice, has the disadvantage of being sensitive to the time interval. Therefore, this paper proposed a method to choose the time of fault occurrence for converter protection setting value verification, from the point of transient process of electrical variables. Concrete steps to implement the method, and the special time intervals that should be noticed, are given in the paper. It's demonstrated by the simulation results that without compromising the accuracy, workload can be significantly reduced with the proposed method.
|
Received: 23 January 2017
Published: 12 April 2018
|
|
|
|
|
[1] 高本锋, 张学伟, 刘辛晔, 等. 高压直流输电保护定值整定流程的研究[J]. 电工技术学报, 2015, 30(12): 400-407. Gao Benfeng, Zhang Xuewei, Liu Xinye, et al.Research of HVDC protection value setting process[J]. Transactions of China Electrotechnical Society, 2015, 30(12): 400-407. [2] 陈仕龙, 张杰, 刘红锐, 等. 特高压直流输电线路单端电流方向暂态保护[J]. 电工技术学报, 2016, 31(2): 171-177. Chen Shilong, Zhang Jie, Liu Hongrui, et al.A single-ended current direction transient protection of UHVDC transmission line[J]. Transactions of China Electrotechnical Society, 2016, 31(2): 171-177. [3] 陈仕龙, 谢佳伟, 毕贵红, 等. 一种特高压直流输电线路神经网络双端故障测距新方法[J]. 电工技术学报, 2015, 30(4): 257-264. Chen Shilong, Xie Jiawei, Bi Guihong, et al.A novel two terminal fault location method used ANN for UHVDC transmission line[J]. Transactions of China Electrotechnical Society, 2015, 30(4): 257-264. [4] 吴庆范, 黄金海, 张爱玲, 等. 溪洛渡-浙江±800kV特高压直流输电工程直流保护系统实施策略及其仿真试验研究[J]. 电力系统保护与控制, 2015, 43(1): 115-121. Wu Qingfan, Huang Jinhai, Zhang Ailing, et al.DC protection system implementation strategy and simulation test study of ±800 kV UHVDC power transmission project from Xiluodu to Zhejiang[J]. Power System Protection and Control, 2015, 43(1): 115-121. [5] 于洋, 孙学锋, 高鹏, 等. 高压直流输电线路暂态保护分析与展望[J]. 电力系统保护与控制, 2015, 43(2): 148-154. Yu Yang, Sun Xuefeng, Gao Peng, et al.Analysis and prospect on transient protection for HVDC transmission lines[J]. Power System Protection and Control, 2015, 43(2): 148-154. [6] 李晓华, 刘洋, 蔡泽祥. 直流输电换流变压器阀侧交流单相接地故障[J]. 电工技术学报, 2012, 27(6): 38-45. Li Xiaohua, Liu Yang, Cai Zexiang.Analysis of grounding fault at HVDC converter transformer valve side[J]. Transactions of China Electrotechnical Society, 2012, 27(6): 38-45. [7] 刘洋, 李晓华, 蔡泽祥. 直流输电系统换流器接地故障定位[J]. 电力系统自动化, 2010, 34(8): 86-91. Liu Yang, Li Xiaohua, Cai Zexiang.Location of HVDC converter grounding fault[J]. Automation of Electric Power Systems, 2010, 34(8): 86-91. [8] Szechtman M, Wess T, Thio C V.A benchmark model for HVDC system studies[C]//International Conference on AC and DC Power Transmission, London, England, 1991: 374-378. [9] 浙江大学发电教研组直流输电科研组. 直流输电[M]. 北京: 电力工业出版社, 1982. [10] 赵畹君. 高压直流输电工程技术[M]. 北京: 中国电力出版社, 2004. [11] 韩民晓. 高雅转直流输电原理与运行[M]. 北京: 机械工业出版社, 2013. [12] 田杰. 高压直流控制保护系统的设计与实现[J]. 电力自动化设备, 2005, 25(9): 10-14. Tian Jie.Design and realization of HVDC control and protection system[J]. Electric Power Automation Equipment, 2005, 25(9): 10-14. [13] 成敬周, 徐政. 换流站内的交流系统故障分析及保护动作特性研究[J]. 中国电机工程学报, 2011, 31(22): 88-95. Cheng Jingzhou, Xu Zheng.Analysis of AC faults in converter station and characteristics of its relay protection[J]. Proceedings of the CSEE, 2011, 31(22): 88-95. [14] 王俊生, 朱斌. 逆变侧换流变阀侧连接线单相接地动作策略分析[J]. 电力系统自动化, 2010, 34(23): 119-123. Wang Junsheng, Zhu Bin.Analysis of fault clearing actions under single phase to ground fault of lines connecting transformer and inverter valve[J]. Automation of Electric Power Systems, 2010, 34(23): 119-123. [15] 李应文, 徐兵, 吴力娜. 换流变压器套管受潮分析及预防措施[J] . 变压器, 2008, 45(4): 71-73. Li Yingwen, Xu Bing, Wu Lina.Wetted analysis and preventive measures of bushing in converter transformer[J]. Transformer, 2008, 45(4): 71-73. [16] 吕鹏飞, 卢宇, 王德林, 等. 灵宝背靠背直流换流站220kV 换流变压器故障保护动作分析[J]. 电力系统自动化, 2008, 32(12) : 211-214. Lü Pengfei, Lu Yu, Wang Delin, et al.Protectionaction analysis of Lingbao HVDC system 220kV converter transformer earthed fault[J]. Automation of Electric Power Systems, 2008, 32(12): 211-214. [17] 吴云飞, 黄友生. 换流变压器阀侧套管局部温度过高的故障分析[J] . 变压器, 2007, 44(8): 36-38. Wu Yunfei, Huang Yousheng.Analysis of partial overtemperature fault of valve bushing in converter transformer[J]. Transformer, 2007, 44(8): 36-38. [18] 陶瑜. 直流输电控制保护系统分析及应用[M]. 北京: 中国电力出版社, 2015. |
|
|
|