Abstract In order to improve the capacity of photovoltaic station access the power generation system,a combined operation mode integrated with photovoltaic(PV)system and energy storage system(ESS)is established to study the characteristics of photovoltaic power station before and after adding energy storage system.A reliability confidence interval calculation method is proposed in order to evaluate the contribution to the reliability of power grid which has PV and ESS.Firstly,Fuzzy-C-Means clustering is done to the historical data of a photovoltaic power station in Golmud,Qinghai province,dividing the historical data into four kinds of weather types,sunny,cloudy,partly cloudy,rainy.Analyzing the historical data and eliminating the outliers by using the Quartile Method.On this basis,an extraction method of power band for PV and ESS generation system is proposed in this paper.Building the IEEE-RTS79 reliability test system and using sequential Monte Carlo method to calculate the reliability index of the power band of PV and ESS generation system,resulting in containing the reliability confidence interval of this system.The results of the reliability interval calculation provides a theoretical basis for evaluating the reliability of the PV and ESS generation system access to the power grid,and it has great guiding significance for the power generation scheduling.
|
Received: 10 May 2016
Published: 18 August 2017
|
|
|
|
|
[1] 丁明,王伟胜,王秀丽,等.大规模光伏发电对电力系统影响综述[J].中国电机工程学报,2014,34(1):1-14. Ding Ming,Wang Weisheng,Wang Xiuli,et al.A review on the effect of large-scale generation on power system[J].Proceedings of the CSEE,2014,34(1):1-14. [2] 2016年第一季度光伏发电建设和运行信息简况-国家能源局[Z].http://www.nea.gov.cn/2016-04/22/c_135303838.htm.2016. [3] 王敏,宗炫君,袁越,等.含光伏电站的发电系统可靠性分析[J].中国电机工程学报,2013,33(34):42-49. Wang Min,Zong Xuanjun,Yuan Yue,et al.Reliability analisys of generation systems with photovoltaic stations[J].Proceedings of the CSEE,2013,33(34):42-49. [4] 王秀丽,武泽辰,曲翀.光伏发电系统可靠性分析及其置信容量计算[J].中国电机工程学报,2014,34(1):15-21. Wang Xiuli,Wu Zechen,Qu Chong.Reliability and capacity value evaluation of photovoltaic generation systems[J].Proceedings of the CSEE,2014,34(1):15-21. [5] 梁双,胡学浩,张东霞,等.基于随机模型的光伏发电置信容量评估方法[J].电力系统自动化,2012,36(13):32-37. Liang Shuang,Hu Xuhao,Zhang Dongxia,et al.Probabilistic models based evaluation method for capacity credit of photovoltaic generation[J].Automation of Electric Power Systems,2012,36(13):32-37. [6] 何俊,邓长虹,徐秋实,等.风光储联合发电系统的可信容量及互补效益评估[J].电网技术,2013,37(11):3030-3036. He Jun,Deng Changhong,Xu Qiushi,et al.Assessment on capacity credit and complementary benedit of power generation system integrate with wind farm,energy storage system and photovoltaic system[J].Power System Technology,2013,37(11):3030-3036. [7] 张卫东,刘祖明,申兰先.利用储能平抑波动的光伏柔性并网研究[J].电力自动化设备,2013,33(5):106-111. Zhang Weidong,Liu Zuming,Shen Lanxian.Flexible grid-connection of photovoltaic power generation system with energy storages system for fluctuation smoothing[J].Electric Power Automation Equipment,2013,33(5):106-111. [8] 何俊,邓长虹,徐秋实,等.基于等可信容量的风光储电源优化配置方法[J].电网技术,2013,37(12):3317-3324. He Jun,Deng Changhong,Xu Qiushi,et,al.Optimal configuration of distributed generation system containing wind PV battery power sources based on equivalent credible capacity theory[J].Power System Technology,2013,37(12):3317-3324. [9] 暴英凯,王越,唐俊熙,等.序贯蒙特卡洛方法在电力系统可靠性评估中的应用差异分析[J].电网技术,2014,38(5):1189-1195. Bao Yingkai,Wang Yue,Tang Junxi,et al.Analysis on differences of applying Sequential Monte Carlo methods in power grid reliability assessmeng[J].Power System Technology,2014,38(5):1189-1195. [10]程林,常垚,刘满君,等.基于伪时序状态转移抽样法评估含储能电力系统可靠性[J].电力系统自动化,2014,38(7):53-59. Cheng Lin,Chang Yao,Liu Manjun,et al.Reliability evaluation of energy storage integrated power system based on Pseudo-sequential state transition sampling algorithm[J].Automation of Electric Power Systems,2014,38(7):53-59. [11]余志强,王淳,胡奕涛,等.并网光伏发电置信容量评估[J].电力系统保护与控制,2016,44(7):122-127. Yu Zhiqiang,Wang Chun,Hu Yitao,et al.Capacity credit evaluation of grid-connected photovoltaic generation[J].Power System Protection and Control,2016,44(7):122-127. [12]李建林,田立亭,李春来.储能联合可再生能源分布式并网发电关键技术[J].电气应用,2015,34(9):28-33. Li Jianlin,Tian Liting,Li Chunlai.Key technology of distributed grid connected power generation with energy storage and renewable energy[J].Electrotechnical Application,2015,34(9):28-33. [13]沈鑫,曹敏.分布式电源并网对于配电网的影响研究[J].电工技术学报,2015,30(增刊1):346-351. Shen Xin,Cao Min.Research on the influence of distributed power grid for distribution network[J].Transactions of China Electrotechnical Society,2015,30(S1):346-351. [14]赵永宁,叶林,朱倩雯.风电场弃风异常数据簇的特征及处理方法[J].电力系统自动化,2014,38(21):39-46. Zhao Yongning,Ye Lin,Zhu Qianwen.Characteristics and processing method of abnormal data clusters caused by wind curtailments in wind farms[J].Automation of Electric Power Systems,2014,38(21):39-46. [15]方鑫,郭强,张东霞,等.考虑天气不确定性的光伏电站置信容量评估[J].电力系统自动化,2012,36(10):27-32. Fang Xin,Guo Qiang,Zhang Dongxia,et al.Capacity credit evaluation of grid-connected photovoltaic generation considering weather uncertainty[J].Automation of Electric Power Systems,2012,36(10):27-32. [16]刘皓明,陆丹,杨波,等.可平抑高渗透分布式光伏发电功率波动的储能电站调度策略[J].高电压技术,2015,41(10):3213-3223. Liu Haoming,Lu Dan,Yang Bo,et al.Sispatch strategy of energy storage station to smooth power fluctuations of high penetration photovoltaic generation[J].High Voltage Engineering,2015,41(10):3213-3223. [17]李滨,陈姝,梁水莹.一种平抑光伏系统输出波动的储能容量优化方法[J].电力系统保护与控制,2014,42(22):45-50. Li Bin,Chen Shu,Liang Shuiying.Acapacity optimization of energy storagy system for output smoothing of photovoltaic station[J].Power System Protection and Control,2014,42(22):45-50. [18]Fossati J P,Galarza A,Martín-Villate A,et al.A method for optimal sizing energy storage systems for microgrids[J].Renewable Energy,2015,77:539-549. [19]张建华,王昕伟,蒋程,等.基于蒙特卡罗方法的风电场有功出力的概率性评估[J].电力系统保护与控制,2014,42(3):82-87. Zhang Jianhua,Wang Xinwei,Jiang Cheng,et al.Probabilistic assessment of wind farm active power based on Monte-Carlo simulation[J].Power System Protection and Control,2014,42(3):82-87. [20]王杨,谢开贵,胡博,等.基于时序模拟的离网型微网可靠性分析[J].电工技术学报,2016,31(6):206-211. Wang Yang,Xie Kaigui,Hu Bo,et al.Reliability analysis of islanded microgrid based on sequential simulation[J].Transactions of China Electrotechnical Society,2016,31(6):206-211. [21]别朝红,李更丰,谢海鹏.计及负荷与储能装置协调优化的微网可靠性评估[J].电工技术学报,2014,29(2):64-73. Bie Chaohong,Li Gengfeng,Xie Haipeng.Reliability evaluation of microgrids considering coordinative optimization of loads and storage devices[J].Transactions of China Electrotechnical Society,2014,29(2):64-73. [22]Subcommittee P M.IEEE reliability test system[J].IEEE Transactions on Power Apparatus & Systems,1979,PAS-98(6):2047-2054. [23]宋晓通.基于蒙特卡罗方法的电力系统可靠性评估[D].济南:山东大学,2008. [24]张硕.计及风电场容量可信度的电力系统可靠性研究[D].北京:华北电力大学,2010. [25]Mosadeghy M,Yan Ruifeng,Saha T K.Impact of PV penetration level on the capacity value of South Australian wind farms[J].Renewable Energy,2016,85:1135-1142. |
|
|