[1] 尹明, 王成山, 葛旭波, 等. 中德风电发展的比较与分析[J]. 电工技术学报, 2010, 25(9): 157-182. Yin Ming, Wang Chengshan, Ge Xubo, et al. Comparison and analysis of wind power development between China and Germany[J]. Transactions of China Electrotechnical Society, 2010. 25(9): 157-182. [2] 游大海, 潘凯, 王科, 等. 含风电场的电力系统协调优化调度的评价技术[J]. 电力系统保护与控制, 2013, 41(1): 157-163. You Dahai, Pan Kai, Wang Ke, et al. Evaluation of coordination optimal dispatching in wind power integrated system [J]. Power System Protection and Control, 2013, 41(1): 157-163. [3] 夏澍, 周明, 李庚银. 含大规模风电场的电力系统动态经济调度[J]. 电力系统保护与控制, 2011, 39(13): 71-77. Xia Shu, Zhou Ming, Li Gengyin. Dynamic economic dispatch of power system containing large-scale wind farm[J]. Power System Protection and Control, 2011, 39(13): 71-77. [4] Chun-Lung Chen. Optimal wind-thermal generating unit commitment[J]. IEEE Transactions on Energy Conversion, 2008, 23(1): 273-280. [5] 谢俊, 李振坤, 章美丹, 等. 机组调峰的价值量化与费用补偿[J]. 电工技术学报, 2013, 28(1): 271-276. Xie Jun, Li Zhengkun, Zhang Meidan, et al. Peaking value quantification and cost compensation for generators[J]. Transactions of China Electrotechnical Society, 2013, 28(1): 271-276. [6] 张宁, 周天睿, 段长刚, 等. 大规模风电场接入对电力系统调峰的影响[J]. 电网技术, 2010, 34(1): 152-158. Zhang Ning, Zhou Tianrui, Duan Changgang, et al. Impact of large-scale wind farm connecting with power grid on peak load regulation demand[J]. Power System Technology, 2010, 34(1): 152-158. [7] 李付强, 王彬, 涂少良, 等. 京津唐电网风力发电并网调峰特性分析[J]. 电网技术, 2009, 33(18): 128-132. Li Fuqiang, Wang Bin, Tu Shaoliang, et al. Analysis on peak load regulation performance of Beijing- Tianjin-Tangshan power grid with wind farms connected[J]. Power System Technology, 2009, 33(18): 128-132. [8] 衣立东, 朱敏奕, 魏磊, 等. 风电并网后西北电网调峰能力的计算方法[J]. 电网技术, 2010, 34(2): 129-132. Yi Lidong, Zhu Minyi, Wei Lei, et al. A computing method for peak load regulation ability of northwest China power grid connected with large-scale wind farms[J]. Power System Technology, 2010, 34(2): 129-132. [9] 张宏宇, 印永华, 申洪, 等. 大规模风电接入后的系统调峰充裕性评估[J]. 中国电机工程学报, 2011, 31(22): 26-31. Zhang Hongyu, Yin Yonghua, Shen Hong, et al. Peak-load regulating adequacy evaluation associated with large-scale wind power integration[J]. Proceedings of the CSEE, 2011, 31(22): 26-31. [10] 杨宏, 刘建新, 苑津莎. 风电系统中常规机组负调峰能力研究[J]. 中国电机工程学报, 2010, 30(16): 26-31. Yang Hong, Liu Jianxin, Yuan Jinsha.Research of peak load regulation of conventional generators in wind power grid[J]. Proceedings of the CSEE, 2010, 30(16): 26-31. [11] George Sideratos, Nikos D Hatziargyriou. An advanced statistical method for wind power forecasting [J]. IEEE Transactions on Power Systems, 2007, 22(1): 258-265. [12] 何东, 刘瑞叶.基于主成分分析的神经网络动态集成风功率超短期预测[J]. 电力系统保护与控制, 2013, 41(4): 50-54. He Dong, Liu Ruiye. Ultra-short-term wind power prediction using ANN ensemble based on the principal components analysis[J]. Power System Protection and Control, 2013, 41(4): 50-54. [13] 刘兴杰, 米增强, 杨奇逊, 等. 一种基于EMD的短期风速多步预测方法[J]. 电工技术学报, 2010, 25(4): 165-170. Liu Xingjie, Mi Zengqiang, Yang Qixun, et al. A novel multi-step prediction for wind speed based on EMD[J]. Transactions of China Electrotechnical Society, 2010, 25(4): 165-170. [14] 王彩霞, 鲁宗相. 风电功率预测信息在日前机组组合中的应用[J]. 电力系统自动化, 2011, 35(7): 13-18. Wang Caixia, Lu Zongxiang. Unit commitment based on wind power forecast[J]. Automation of Electric Power System, 2011, 35(7): 13-18. [15] Lennart Söder. Reserve Margin Planning in a wind- hydro-thermal power system[J]. IEEE Transactions on Power Systems, 1993, 8(2): 564-571. [16] Ronan Doherty, Mark O'Malley. A new approach to quantify reserve demand in systems with significant installed wind capacity[J]. IEEE Transactions on Power Systems, 2005, 20(2): 587-595. |