Transactions of China Electrotechnical Society  2022, Vol. 37 Issue (3): 719-728    DOI: 10.19595/j.cnki.1000-6753.tces.210079
Current Issue| Next Issue| Archive| Adv Search |
Spot Quotation Unit Construction Method of Cascade Hydropower Based on “Virtual Reservoir”
Zhang Hongtu1, Xiong Zhijie1, Zhu Yanmei2, Huang Weibin2, Chen Shijun2
1. State Grid Sichuan Electric Power Company Chengdu 610046 China;
2. State Key Laboratory of Hydraulics and Mountain River Engineering College of Water Resource and Hydropower Sichuan University Chengdu 610065 China

Copyright © Transactions of China Electrotechnical Society
Supported by: Beijing Magtech