Transactions of China Electrotechnical Society  2014, Vol. 29 Issue (8): 301-308    DOI:
Current Issue| Next Issue| Archive| Adv Search |
Optimal Architecture Planning of Microgrid Considering User Outage Costs
Guo Xian1, Guo He2, Cheng Haozhong1, Masoud Bazargan3, Liang Wuxing3
1. Key Laboratory of Control of Power Transmission and Transformation Shanghai Jiao Tong University Shanghai 200240 China;
2. Engineering Dept. Shanghai Power Equipment Research Institute Shanghai 200240 China;
3. ALSTOM Grid Research & Technology Centre Stafford ST17 4LX UK

Copyright © Transactions of China Electrotechnical Society
Supported by: Beijing Magtech