1. State Key Laboratory of Electrical Insulation for Power Equipment Xi’an Jiaotong University Xi’an 710049 China 2. Shaoxing Electric Power Bureau Shaoxing 312000 China
Abstract:Capacitor stacks radiate a lot of noise in HVDC converter stations,and the noise level and the vibration should be predicted. The prediction method of capacitor tank vibration is concerned in this paper. A novel prediction method of capacitor tank vibration is proposed methodically based on a frequency response function. The frequency response function,which is the frequency domain quotient of vibration velocity of capacitor tank and the squared capacitor voltage,is defined as the electro-mechanical frequency response function and can be obtained by impulse discharge test. Under given excitation,the vibration velocity can be calculated by the product of electro-mechanical frequency response function and the squared voltage in frequency domain. The comparison of predicted and measured vibration of capacitor tank under two excitations is conducted to verify the effectiveness of the prediction method presented in this paper.
祝令瑜,汲胜昌,沈琪,刘源,刘浩. 基于冲击放电试验的电力电容器外壳振动预估方法[J]. 电工技术学报, 2014, 29(11): 239-246.
Zhu Lingyu,Ji Shengchang,Shen Qi,Liu Yuan,Liu Hao. Vibration Prediction Method for Power Capacitors Based on the Impulse Discharge Test. Transactions of China Electrotechnical Society, 2014, 29(11): 239-246.
[1] CIGRE,No. 202 W. G 14. 26,HVDC stations audible noise[R]. Apr. 2002,Tech. Rep. [2] 李文毅,孙竹森,肖安全,等. 三沪直流工程换流站噪声治理[J]. 中国电力. 2008,41(1): 32-35. Li Wenyi,Sun Zhusen,Xiao Anquan. Noise treatment in Three Gorges—Shanghai ± 500kV DC transmission converter stations[J]. Electric Power,2008,41(1): 32-35. [3] 杨一鸣,章旭雯. 特高压直流换流站设备的降噪措施[J]. 高电压技术,2006,32(9): 149-152. Yang Yiming,Zhang Xuwen. Study on noise reduce for equipment at UHVDC converter station[J]. High Voltage Engineering,2006,32(9): 149-152. [4] 韩辉,吴桂芳,瞿雪弟,等. 我国±500kV换流站设备可听噪声的测量分析及降噪措施[J]. 电网技术,2008,32(2): 38-41. Han Hui,Wu Guifang,Qu Xuedi,et al. Measurement and analysis of audible noise bringing about by equipment in domestic ±500kV converter stations and noise reduction measures[J]. Power System Technology,2008,32(2): 38-41. [5] 俞敦辉. ±800kV特高压换流站噪声控制探讨[J]. 电力建设,2009,30(3): 13-16. Yu Dunhui. Discussion on ±800kV UHV converter station noise control[J]. Electric Power Construction,2009,30(3): 13-16. [6] 张劲松. 高压直流换流站噪声综合治理研究[J]. 电力建设,2007,28(8): 14-16. Zhang Jinsong. Research on comprehensive treatment of HVDC converter station noise[J]. Electric Power Construction,2007,28(8): 14-16. [7] 高湛,胡小龙. 蔡家冲(宜都)换流站噪声冶理研究和实践[J]. 电力建设,2007,28(3): 13-16. Gao Zhan,Hu Xiaolong. Research and practice of noise control for Caijiachong(Yidu) converter station [J]. Electric Power Construction,2007,28(3): 13-16. [8] 高湛,胡小龙,李华. 高岭背靠背换流站噪声控制方案研究[J]. 电力建设,2008,29(8): 22-24. Gao Zhan,Hu Xiaolong,Li Hua. Study on noise control scheme for Gaoling back-to-back converter station[J]. Electric Power Construction,2008,29(8): 22-24. [9] 孙竹森,俞敦耀. 华新换流站噪声控制探讨[J]. 电力建设,2007,28(11): 10-13. Sun Zhusen,Yu Dunyao. Discussion on noise control at Huaxin converter station[J]. Electric Power Construc- tion,2007,28(11): 10-13. [10] 中国电力科学研究院. 三峡–常州±500kV直流输电工程可听噪声测试报告[R]. 2003. [11] 中国电力科学研究院. 三峡–广州±500kV直流输电工程可听噪声测试报告[R]. 2004. [12] 北京网联直流输电工程咨询有限责任公司. “三峡—上海直流输电项目”技术规范[R]. 北京: 2005. [13] Cox M D,Guan H H. Vibration and audible noise of capacitors subjected to non-sinusoidal waveforms[J]. IEEE Transactions on Power Delivery,1994,9(2): 856-862. [14] Smede J,Johansson C G,Winroth O,et al. Design of HVDC converter stations with respect to audible noise requirements[J]. IEEE Transactions on Power Delivery,1995,10(2): 747-758. [15] 曹涛,汲胜昌,吴鹏,等. 基于振动信号的电容器噪声水平计算方法[J]. 电工技术学报,2010,25(6): 172-177. Cao Tao,Ji Shengchang,Wu Peng,et al. Calculation method of noise level for capacitor based on vibration signal[J]. Transactions of China Electrotechnical Society,2010,25(6): 172-177. [16] 孙新波,陈花玲,姚成. 电容器装置噪声水平的估算方法[J]. 电力电容器与无功补偿,2008,29(1): 13-16. Sun Xinbo,Chen Hualing,Yao Cheng. Estimating method for noise level of capacitor installations[J]. Power Capacitor & Reactive Power Compensation,2008,29(1): 13-16. [17] 孙新波,吴九汇,陈花玲. Kirchhoff公式在电容器装置噪声水平预估中的应用[J]. 噪声与振动控制,2009,29(5): 140-175. Sun Xinbo,Wu Jiuhui,Chen Hualing. Application of kirchhoff formula in prediction of noise level of capacitor installation[J]. Noise and Vibration Control,2009,29(5): 140-175. [18] 魏浩征,李志远,黎小林,等. 高压直流换流站电容器的声功率的确定方法[J]. 高压电器,2010,46(1): 68-75. Wei Haozheng,Li Zhiyuan,Li Xiaolin,et al. Acoustic power determination of capacitors in HVDC converter station[J]. High Voltage Apparatus,2010,46(1): 68-75. [19] 汲胜昌,寇小括,李彦明. 换流站中电容器装置噪声水平计算方法的研究[J]. 中国电机工程学报,2006,26(3): 112-118. Ji Shengchang,Kou Xiaokuo,Li Yanming. Study on the calculation method of noise level for capacitor installation at converter station[J]. Proceedings of the CSEE,2006,26(3): 112-118. [20] Ji S,Wu P,Zhang Q,et al. Study on the noise-level calculation method for capacitor stacks in HVDC converter station[J]. IEEE Transactions on Power Delivery,2010,25(3): 1866-1873. [21] 赵畹君. 高压直流输电工程技术[M]. 北京: 中国电力出版社,2004. [22] IEC 60871—1—1997 Shunt capacitors for a. c. power systems having a rated voltage above 1 000V—Part 1: General-performance,testing and rating-safety require- ments-Guide for installation and operation[S]. 1979. [23] GB/T 6882—2008声学 声压法测定噪声源声功率级: 消声室和半消声室精密法[S]. 2008.